Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
90 |
|
TURBINE VALVE TESTING IN PROGRESS. 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. |
* |
|
Dresden 3 |
85 |
|
HOLDING POWER FOR WELD REPAIR OF RFP "A" . 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. |
* |
|
Duane Arnold |
0 |
02/04/2007 |
REFUELING OUTAGE. 4 OF 6 POWER LINES DOWN DUE TO ICING. HAVE 2 161 KV LINES FEEDING THE EAST BUS AND THE WEST BUS. |
* |
|
Fermi 2 |
100 |
|
EDG # 11 IS OSS FOR PLANNED MAINTENANCE. STILL HAVE EDGs #12, # 13, & # 14 FULLY OPERABLE IF NEEDED. ONLY NEED TWO TO SUPPORT VITAL BUSSES. |
* |
|
Kewaunee |
100 |
|
FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE |
|
|
La Salle 1 |
100 |
|
|
|
|
La Salle 2 |
87 |
|
COASTDOWN TO REFUELING OUTAGE. |
* |
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
* |
|
Point Beach 1 |
95 |
|
INCREASING POWER AFTER COMPLETING PLANNED TESTING |
* |
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Prairie Island 2 |
100 |
|
345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY |
|
|
Quad Cities 1 |
85 |
|
REDUCED POWER FOR SCRAM TIME TESTING AND ROD SHUFFLE |
* |
|
Quad Cities 2 |
96 |
|
100% ELECTRICAL CAPABILITY |
|
|