Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
100 |
|
|
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
55 |
|
REDUCED POWER FOR PLANNED MAINTENANCE |
|
|
BRUNSWICK 2 |
100 |
|
|
|
|
CATAWBA 1 |
88 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
86 |
|
REDUCED REACTOR POWER DUE TO "1C" COOLING TOWER BEING TAKEN OUT OF SERVICE FOR REPAIRS. |
* |
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
0 |
09/29/2000 |
REFUELING OUTAGE |
|
|
HATCH 2 |
100 |
|
|
|
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
0 |
09/01/2000 |
EXITING REFUELING OUTAGE |
|
|
NORTH ANNA 1 |
100 |
|
|
|
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
100 |
|
|
* |
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
100 |
|
. |
|
|
SEQUOYAH 1 |
0 |
10/06/2000 |
INVESTIGATING PROBLEM WITH VIBRATION OF RCP #4 |
|
|
SEQUOYAH 2 |
85 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
SUMMER 1 |
0 |
10/07/2000 |
ENTERING REFUELING OUTAGE #12 |
* |
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
0 |
09/30/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
0 |
09/24/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
VOGTLE 1 |
0 |
09/17/2000 |
REFUELING OUTAGE - REFUELING |
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
30 |
|
HOLDING POWER LEVEL FOR STEAM GENERATOR CHEMISTRY AND INCORE FLUX MAP. |
* |
|