Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
100 |
|
|
|
|
BROWNS FERRY 3 |
100 |
|
|
|
|
BRUNSWICK 1 |
100 |
|
|
|
|
BRUNSWICK 2 |
0 |
09/22/2000 |
FORCED OUTAGE - MAIN TRANSFORMER FIRE - SEE EVENT #37364 |
|
|
CATAWBA 1 |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
100 |
|
|
|
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
100 |
|
|
|
|
HATCH 1 |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
HATCH 2 |
100 |
|
|
|
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
0 |
09/01/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
NORTH ANNA 1 |
100 |
|
|
|
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
* |
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
100 |
|
|
|
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
100 |
|
. |
|
|
SEQUOYAH 1 |
0 |
09/25/2000 |
RX TRIP ON LOW STEAM GENERATOR WATER LEVEL - SEE EVENT #37375; UE BASED ON RCS LEAKAGE OF 45 GPM WHILE PLACING RHR IN SERVICE - SEE EVENT #37378 - '1B' RHR RELIEF VALVE WILL BE ISOLATED AND "A" TRAIN RHR PLACED IN SERVICE IN APPROXIMATELY 1 HOUR |
* |
1 |
SEQUOYAH 2 |
93 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
SUMMER 1 |
92 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
SURRY 1 |
100 |
|
|
|
|
SURRY 2 |
89 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
0 |
09/24/2000 |
REFUELING OUTAGE - COOLDOWN WILL COMMENCE IN APPROXIMATELY 1 HOUR |
* |
|
VOGTLE 1 |
0 |
09/17/2000 |
REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS |
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
0 |
09/09/2000 |
REFUELING OUTAGE - CORE RELOAD COMPLETED |
|
|