Power Reactor Status Report for April 17, 2000
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BEAVER VALLEY 1 |
99 |
|
INCREASING POWER AFTER EXITING A REFUELING OUTAGE |
* |
|
BEAVER VALLEY 2 |
100 |
|
|
|
|
CALVERT CLIFFS 1 |
0 |
03/10/2000 |
EXITING REFUELING OUTAGE |
|
|
CALVERT CLIFFS 2 |
100 |
|
|
|
|
FITZPATRICK 1 |
100 |
|
|
|
|
GINNA 1 |
100 |
|
|
|
|
HOPE CREEK 1 |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
INDIAN POINT 2 |
0 |
02/15/2000 |
MAINTENANCE/REFUELING OUTAGE - FUEL PARTIALLY OFFLOADED |
|
|
INDIAN POINT 3 |
100 |
|
|
|
|
LIMERICK 1 |
0 |
03/29/2000 |
REFUELING OUTAGE - SECOND PHASE OF FUEL SHUFFLE IN PROGRESS |
|
|
LIMERICK 2 |
100 |
|
|
|
|
MILLSTONE 2 |
100 |
|
|
|
|
MILLSTONE 3 |
100 |
|
|
|
|
NINE MILE POINT 1 |
100 |
|
|
|
|
NINE MILE POINT 2 |
0 |
03/03/2000 |
REFUELING OUTAGE |
|
|
OYSTER CREEK 1 |
100 |
|
|
|
|
PEACH BOTTOM 2 |
100 |
|
|
* |
|
PEACH BOTTOM 3 |
100 |
|
|
|
|
PILGRIM 1 |
100 |
|
|
|
|
SALEM 1 |
27 |
|
UNIT ON LINE - INCREASING POWER AT A RATE OF 5% PER HOUR AFTER RECOVERING FROM A MANUAL REACTOR TRIP FROM 99% POWER DUE TO A TURBINE RUNBACK ON 04/12/00 (REFER TO EVENT #36882) |
* |
|
SALEM 2 |
100 |
|
|
* |
|
SEABROOK 1 |
100 |
|
|
|
|
SUSQUEHANNA 1 |
0 |
03/18/2000 |
REFUELING OUTAGE - FUEL SHUFFLE IN PROGRESS |
|
|
SUSQUEHANNA 2 |
100 |
|
|
|
|
THREE MILE ISLAND 1 |
100 |
|
|
|
|
VERMONT YANKEE 1 |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BROWNS FERRY 1 |
0 |
03/03/1985 |
DEFUELED |
|
|
BROWNS FERRY 2 |
100 |
|
|
|
|
BROWNS FERRY 3 |
0 |
04/15/2000 |
AUTOMATIC REACTOR SCRAM FROM 70% POWER ON LOW REACTOR VESSEL WATER LEVEL (RVWL) DUE TO LOSS OF A FEEDWATER PUMP - BOTH RECIRC PUMPS ALSO TRIPPED ON LOW RVWL RESULTING IN ACTUATION OF HPCI AND RCIC (REFER TO EVENT #36892) - ENTERING REFUELING OUTAGE EARLY |
|
1 |
BRUNSWICK 1 |
100 |
|
|
|
|
BRUNSWICK 2 |
100 |
|
|
|
|
CATAWBA 1 |
100 |
|
|
|
|
CATAWBA 2 |
100 |
|
|
|
|
CRYSTAL RIVER 3 |
100 |
|
|
|
|
FARLEY 1 |
0 |
03/04/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
FARLEY 2 |
100 |
|
|
|
|
HARRIS 1 |
0 |
04/15/2000 |
ENTERING REFUELING OUTAGE |
|
|
HATCH 1 |
100 |
|
|
|
|
HATCH 2 |
94 |
|
HOLDING POWER AT THIS LEVEL DUE TO OSCILLATIONS ON TURBINE CONTROL VALVE #4 AFTER EXITING A REFUELING OUTAGE |
* |
|
MCGUIRE 1 |
100 |
|
|
|
|
MCGUIRE 2 |
100 |
|
|
|
|
NORTH ANNA 1 |
100 |
|
|
|
|
NORTH ANNA 2 |
100 |
|
|
|
|
OCONEE 1 |
100 |
|
|
|
|
OCONEE 2 |
100 |
|
|
|
|
OCONEE 3 |
0 |
04/12/2000 |
REFUELING OUTAGE |
|
|
ROBINSON 2 |
100 |
|
|
|
|
SAINT LUCIE 1 |
100 |
|
|
|
|
SAINT LUCIE 2 |
0 |
04/17/2000 |
ENTERING REFUELING OUTAGE |
* |
|
SEQUOYAH 1 |
100 |
|
|
|
|
SEQUOYAH 2 |
100 |
|
|
|
|
SUMMER 1 |
100 |
|
|
* |
|
SURRY 1 |
0 |
04/16/2000 |
ENTERING REFUELING OUTAGE |
* |
|
SURRY 2 |
100 |
|
|
|
|
TURKEY POINT 3 |
100 |
|
|
|
|
TURKEY POINT 4 |
100 |
|
|
|
|
VOGTLE 1 |
100 |
|
|
|
|
VOGTLE 2 |
100 |
|
|
|
|
WATTS BAR 1 |
100 |
|
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
BRAIDWOOD 1 |
100 |
|
|
|
|
BRAIDWOOD 2 |
0 |
04/15/2000 |
AUTOMATIC NEGATIVE FLUX RATE TRIP FROM 100% DUE TO A DROPPED ROD ON 04/15/00 (REFER TO EVENT #36893) - MANUAL REACTOR TRIP DUE TO A DIFFERENCE BETWEEN SHUTDOWN BANK 'B' GROUP DEMAND AND DIGITAL ROD POSITION INDICATION FOR ROD G-13 (REFER TO EVENT #36895) |
|
2 |
BYRON 1 |
100 |
|
|
|
|
BYRON 2 |
100 |
|
|
* |
|
CLINTON 1 |
100 |
|
|
|
|
COOK 1 |
0 |
09/08/1997 |
REFUELING OUTAGE - DEFUELED |
|
|
COOK 2 |
0 |
09/09/1997 |
REFUELING OUTAGE - REFUELED - CORE ALTERATIONS COMPLETE |
|
|
DAVIS BESSE 1 |
0 |
03/31/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
DRESDEN 2 |
100 |
|
|
|
|
DRESDEN 3 |
100 |
|
|
|
|
DUANE ARNOLD 1 |
100 |
|
|
|
|
FERMI 2 |
0 |
04/01/2000 |
REFUELING OUTAGE - FIRST OF TWO FUEL SHUFFLES COMPLETE - CONTROL ROD RECOUPLING IN PROGRESS |
* |
|
KEWAUNEE 1 |
97 |
|
|
|
|
LASALLE 1 |
100 |
|
|
|
|
LASALLE 2 |
100 |
|
|
|
|
MONTICELLO 1 |
100 |
|
|
|
|
PALISADES 1 |
100 |
|
|
|
|
PERRY 1 |
80 |
|
INCREASING POWER AT A RATE OF ABOUT 1% PER HOUR AFTER DECREASING TO 72% POWER TO PERFORM FUEL LEAK LOCALIZATION ACTIVITIES - TWO POSSIBLE LEAKERS IDENTIFIED |
* |
|
POINT BEACH 1 |
100 |
|
|
|
|
POINT BEACH 2 |
100 |
|
|
|
|
PRAIRIE ISLAND 1 |
100 |
|
|
|
|
PRAIRIE ISLAND 2 |
100 |
|
|
|
|
QUAD CITIES 1 |
100 |
|
|
|
|
QUAD CITIES 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report(*) |
Number of Scrams(#) |
ARKANSAS NUCLEAR 1 |
100 |
|
|
|
|
ARKANSAS NUCLEAR 2 |
100 |
|
|
|
|
CALLAWAY 1 |
100 |
|
|
|
|
COMANCHE PEAK 1 |
100 |
|
|
|
|
COMANCHE PEAK 2 |
100 |
|
|
|
|
COOPER 1 |
0 |
03/04/2000 |
REFUELING OUTAGE |
|
|
DIABLO CANYON 1 |
100 |
|
|
|
|
DIABLO CANYON 2 |
100 |
|
|
|
|
FT CALHOUN 1 |
100 |
|
INVESTIGATING COMPUTER PROBLEMS INVOLVING CALCULATION OF CORE PEAKING FACTORS |
* |
|
GRAND GULF 1 |
100 |
|
|
|
|
PALO VERDE 1 |
100 |
|
|
|
|
PALO VERDE 2 |
100 |
|
|
|
|
PALO VERDE 3 |
0 |
04/14/2000 |
REFUELING OUTAGE - DEFUELED |
|
|
RIVER BEND 1 |
100 |
|
|
|
|
SAN ONOFRE 2 |
100 |
|
|
|
|
SAN ONOFRE 3 |
100 |
|
|
|
|
SOUTH TEXAS 1 |
0 |
03/01/2000 |
REFUELING OUTAGE - DEFUELED - REPLACING STEAM GENERATORS |
|
|
SOUTH TEXAS 2 |
100 |
|
|
* |
|
WATERFORD 3 |
100 |
|
|
|
|
WNP-2 |
85 |
|
INCREASING POWER TO 95% AS PART OF LOAD FOLLOWING ACTIVITIES |
* |
|
WOLF CREEK 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|