skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Power Reactor Status Report for January 1, 2000

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BEAVER VALLEY 1 100        
BEAVER VALLEY 2 51   FUEL CONSERVATION *  
CALVERT CLIFFS 1 100        
CALVERT CLIFFS 2 65   Y2K TRANSITION PLANNED POWER *  
FITZPATRICK 1 80   Y2K TRANSITION PLANNED POWER *  
GINNA 1 100        
HOPE CREEK 1 86   Y2K TRANSITION PLANNED POWER *  
INDIAN POINT 2 99        
INDIAN POINT 3 100        
LIMERICK 1 64   FOLLOWING LOAD SCHEDULE *  
LIMERICK 2 0 12/31/1999 REACTOR SCRAM DUE TO MAIN TRANSFORMER FAILURE. SEE EVENT 36553.    
MILLSTONE 2 100        
MILLSTONE 3 100        
NINE MILE POINT 1 76   REMOVING A CONDENSATE PUMP FROM SERVICE    
NINE MILE POINT 2 98     *  
OYSTER CREEK 1 70   Y2K TRANSITION PLANNED POWER *  
PEACH BOTTOM 2 70   WILL MAINTAIN REDUCED POWER THROUGH Y2K TRANSITION    
PEACH BOTTOM 3 70   WILL MAINTAIN REDUCED POWER THROUGH Y2K TRANSITION    
PILGRIM 1 100        
SALEM 1 80   Y2K TRANSITION PLANNED POWER *  
SALEM 2 80   Y2K TRANSITION PLANNED POWER *  
SEABROOK 1 100        
SUSQUEHANNA 1 80   Y2K TRANSITION PLANNED POWER *  
SUSQUEHANNA 2 80   Y2K TRANSITION PLANNED POWER *  
THREE MILE ISLAND 1 85   Y2K TRANSITION PLANNED POWER *  
VERMONT YANKEE 1 100        

Region 2

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BROWNS FERRY 1 0 03/03/1985 DEFUELED    
BROWNS FERRY 2 100        
BROWNS FERRY 3 100        
BRUNSWICK 1 100        
BRUNSWICK 2 100        
CATAWBA 1 100        
CATAWBA 2 0 12/30/1999 REACTOR TRIP FOR UNKNOWN REASONS. SEE EVENT 36551.    
CRYSTAL RIVER 3 70   Y2K TRANSITION PLANNED POWER *  
FARLEY 1 100        
FARLEY 2 100        
HARRIS 1 100        
HATCH 1 100        
HATCH 2 98   MAXIMUM OPERATING POWER    
MCGUIRE 1 85   Y2K TRANSITION PLANNED POWER *  
MCGUIRE 2 65   HOLDING POWER AT THIS LEVEL IN ORDER TO EXTEND CORE LIFE    
NORTH ANNA 1 100        
NORTH ANNA 2 100        
OCONEE 1 100        
OCONEE 2 100        
OCONEE 3 26   Y2K TRANSITION HOLD POWER *  
ROBINSON 2 100        
SAINT LUCIE 1 100        
SAINT LUCIE 2 100        
SEQUOYAH 1 100        
SEQUOYAH 2 100        
SUMMER 1 100        
SURRY 1 100        
SURRY 2 100        
TURKEY POINT 3 100        
TURKEY POINT 4 100        
VOGTLE 1 100        
VOGTLE 2 78   MONITORING Y2K TRANSITION HOLDING POWER *  
WATTS BAR 1 100        

Region 3

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
BRAIDWOOD 1 75   Y2K TRANSITION PLANNED POWER *  
BRAIDWOOD 2 65   Y2K TRANSITION PLANNED POWER *  
BYRON 1 70   Y2K TRANSITION PLANNED POWER *  
BYRON 2 70   Y2K TRANSITION PLANNED POWER *  
CLINTON 1 80   Y2K TRANSITION PLANNED POWER *  
COOK 1 0 09/08/1997 REFUELING OUTAGE - DEFUELED    
COOK 2 0 09/09/1997 REFUELING OUTAGE - DEFUELED    
DAVIS BESSE 1 85   Y2K TRANSITION PLANNED POWER *  
DRESDEN 2 67   REDUCED POWER FOR PLANNED MAINTENANCE *  
DRESDEN 3 100        
DUANE ARNOLD 1 98     *  
FERMI 2 78   Y2K TRANSITION PLANNED POWER *  
KEWAUNEE 1 97        
LASALLE 1 81   Y2K TRANSITION PLANNED POWER *  
LASALLE 2 87   Y2K TRANSITION PLANNED POWER *  
MONTICELLO 1 84   COASTDOWN TO REFUELING OUTAGE    
PALISADES 1 54   CHEMISTRY HOLD *  
PERRY 1 85   Y2K TRANSITION PLANNED POWER *  
POINT BEACH 1 96     *  
POINT BEACH 2 98     *  
PRAIRIE ISLAND 1 100        
PRAIRIE ISLAND 2 100        
QUAD CITIES 1 86   Y2K TRANSITION PLANNED POWER *  
QUAD CITIES 2 93   COASTDOWN TO REFUELING OUTAGE *  

Region 4

To top of page
Unit Power Down Reason or Comment Change in report(*) Number of Scrams(#)
ARKANSAS NUCLEAR 1 80   Y2K TRANSITION PLANNED POWER *  
ARKANSAS NUCLEAR 2 81   REDUCED POWER FOR MAINTENANCE ON 'A' MFP *  
CALLAWAY 1 100        
COMANCHE PEAK 1 100        
COMANCHE PEAK 2 100        
COOPER 1 72   Y2K TRANSITION PLANNED POWER *  
DIABLO CANYON 1 80   Y2K TRANSITION PLANNED POWER *  
DIABLO CANYON 2 80   Y2K TRANSITION PLANNED POWER *  
FT CALHOUN 1 100        
GRAND GULF 1 81   REDUCED POWER THROUGH Y2K TRANSITION *  
PALO VERDE 1 95   Y2K TRANSITION PLANNED POWER *  
PALO VERDE 2 95   Y2K TRANSITION PLANNED POWER *  
PALO VERDE 3 95   Y2K TRANSITION PLANNED POWER *  
RIVER BEND 1 90   REDUCED POWER THROUGH Y2K TRANSITION    
SAN ONOFRE 2 100        
SAN ONOFRE 3 100        
SOUTH TEXAS 1 100        
SOUTH TEXAS 2 100        
WATERFORD 3 75   REDUCED POWER THROUGH Y2K TRANSITION    
WNP2 80   Y2K TRANSITION PLANNED POWER *  
WOLF CREEK 1 54   Y2K TRANSITION PLANNED POWER *  

To top of page

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.