skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Regulatory Issue Summaries
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999

Regulatory Issue Summaries - 2006

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information. For successful viewing of PDF documents on our site please be sure to use the latest version of Adobe.

Document Number Date Title
RIS-06-027 SUP. 1 06/27/07 Availability of Nrc 313a Series of Forms and Guidance for Their Completion
RIS-06-027 12/13/06 Availability of NRC 313A Series of Forms and Guidance for their Completion
RIS-06-026 12/07/06 Training and Experience and Grandfather Provisions for Authorized Medical Physicists under 10 CFE Part 35
RIS-06-025 12/07/06 Requirements for the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 and 32.51a
RIS-06-024 12/06/06 Revised Review and Transmittal Process for Accident Sequence Precursor Analyses
RIS-06-023 12/06/06 Post-tornado Operability of Ventilating and Air-conditioning Systems Housed in Emergency Diesel Generator Rooms
RIS-06-022 11/15/06 Lessons Learned from Recent 10 CFR Part 72 Dry Cask Storage Campaign
RIS-06-021 09/28/06 Improving Response Capabilities Through the Use of an Incident Response Electronic Library
RIS-06-020 09/14/06 Guidance for Receiving Enforcement Discretion When Concentrating Uranium at Community Water Systems
RIS-06-019 09/14/06
Availability of Guidance on Radioactive Seed Localization
RIS-06-018 08/31/06 Requesting Exemption from the Public Dose Limits for Certain Caregivers of Hospital Patients
RIS-06-017 08/24/06 NRC Staff Position on the Requirements of 10 CFR 50.36, "Technical Specifications,” Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels
RIS-06-016 08/15/06 Transfer of the Management Oversight of Certain NRC Region I Licensees in Mississippi to the NRC Region IV Office
RIS-06-015 08/14/06
Preparation and Scheduling of Operator Licensing Examinations
RIS-06-014 09/22/06 Enforcement Discretion for Facility Changes Under 10 CFR 70.72(c)(2)
RIS-06-013 07/31/06 Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture
RIS-06-012 07/19/06 Endorsement of Nuclear Energy Institute Guidance "Enhancements to Emergency Preparedness Programs for Hostile Action"
RIS-06-011 07/20/06 Requesting Quality Assurance Program Approval Renewals Online By Electronic Information Exchange
RIS-06-010 06/30/06 Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions
RIS-06-009 06/21/06 NRC's Procedures for Review of Decommissioning Funding Assurance Reports
RIS-06-008 06/12/06 Publicly Available Cover Letters for Security-Related Inspection Report
RIS-06-007 06/12/06 Changes to the Safety System Unavailability Performance Indicators
RIS-06-006 05/31/06 New Reactor Standardization Needed to Support the Design-Centered Licensing Review Approach
RIS-06-005 04/20/06 Withdrawal of Transportation Safeguards Advisories SA-01-01, Rev. 1 and SA-03-02
RIS-06-004 03/07/06 Experience With Implementation of Alternative Source Terms
RIS-06-003 02/24/06 Guidance On Requesting an Exemption From Biennial Emergency Prepareness Exercise Requirements
RIS-06-002 02/23/06 Good Practices For Licensee Performance During The Emergency Prepareness Conponent of Force-On-Force Exercises
RIS-06-001 01/24/06
Expiration Date for NRC-Approved Spent Fuel Transportation Routes


Privacy Policy | Site Disclaimer
Thursday, August 02, 2007