Document Number |
Date |
Title |
RIS-03-018s2 |
12/12/2005 |
Use of Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels" Revision 4, dated January 2003 |
RIS-03-018s1 |
07/13/2004 |
NRC Regulatory Issue Summary 2003-18, Supplement 1: Use of Nuclear Energy Institute (NEI) 99-01, "Methodology for
Development of Emergency Action Levels" |
RIS 03-018 |
10/08/2003 |
NRC Regulatory Issue Summary 2003-18: Use of NEI 99-01,
“Methodology for Development of Emergency Action Levels,”
Revision 4, dated January 2003 |
RIS 03-017 |
10/06/2003 |
NRC Regulatory Issue Summary 2003-17: Complying with
10 CFR 35.59, “Recentness of Training,” for Board-Certified
Individuals Whose Training and Experience Were Completed More than
7 Years Ago |
RIS 03-016 |
10/07/2003 |
NRC Regulatory Issue Summary 2003-16: NRC Threat Advisory
and Protective Measures System |
RIS 03-015 |
09/05/2003 |
NRC Regulatory Issue Summary 2003-15: Consolidation
of the Region I and Region II Materials Program |
RIS 03-014 |
08/27/2003 |
NRC Regulatory Issue Summary 2003-14: Preparation and
Scheduling of Operator Licensing Examinations |
RIS 03-013 |
07/29/2003 |
NRC Regulatory Issue Summary 2003-13: NRC Review of
Responses to Bulletin 2002-01, “Reactor Pressure Vessel Head
Degradation and Reactor Coolant Pressure Boundary Integrity” |
RIS 03-012 |
06/24/2003 |
NRC Regulatory Issue Summary 2003-12: Clarification
of NRC Guidance for Modifying Protective Actions |
RIS 03-011 |
07/16/2003 |
NRC Regulatory Issue Summary 2003-11: Reporting Requirements
for Distributors of Devices Subject to the General License Requirements
of 10 CFR 31.5 |
RIS 03-010 |
06/13/2003 |
NRC Regulatory Issue Summary 2003-10: Licensed
Operator Requalification Training: Written Examination Frequency |
RIS 03-009 |
05/01/2003 |
NRC Regulatory Issue Summary 2003-09: Environmental
Qualification of Low-Voltage Instrumentation and Control Cables |
RIS 03-008 |
04/30/2003 |
NRC Regulatory Issue Summary 2003-08: Protection
of Safeguards Information from Unauthorized Disclosure |
RIS 03-007 |
04/23/2003 |
NRC Regulatory Issue Summary 2003-07: Issuance
of Regulations Revising Filing Requirements for Advance Notification
of the Requirements for the Shipment of Spent Nuclear Fuel and Special
Nuclear Material |
RIS 03-006 |
03/20/2003 |
NRC Regulatory Issue Summary 2003-06: High
Security Protected and Vital Area Barrier/Equipment Penetration Manual |
RIS 03-005 |
03/19/2003 |
NRC Regulatory Issue Summary 2003-05: Issuance
of Orders Imposing Additional Physical Protection Measures for Independent
Spent Fuel Storage Installations Using Dry Storage |
RIS 03-004 |
02/13/2003 |
NRC Regulatory Issue Summary 2003-04: Use
of the Effective Dose Equivalent in Place of the Deep Dose Equivalent
in Dose Assessments |
RIS 03-003
|
02/06/2003 |
NRC Regulatory Issue Summary 2003-03: Release
of Draft Review Standard (RS) 002, "Processing Applications for
Early Site Permits," for Interim Use |
RIS 03-002
|
02/03/2003 |
NRC Regulatory Issue Summary 2003-02: Importance
of Giving NRC Advance Notice of Intent to Pursue License Renewal. |
RIS 03-001
|
01/21/2003 |
NRC Regulatory Issue Summary 2003-01: Examination
of Dissimilar Metal Welds, Supplement 10 to Appendix VIII of Section
XI of the ASME Code |