Document Number |
Date |
Title |
RIS-06-027 SUP. 1 |
06/27/07 |
Availability of Nrc 313a Series of Forms and Guidance for Their Completion |
RIS-06-027 |
12/13/06 |
Availability of NRC 313A Series of Forms and Guidance for their Completion |
RIS-06-026 |
12/07/06 |
Training and Experience and Grandfather Provisions for Authorized Medical Physicists under 10 CFE Part 35 |
RIS-06-025 |
12/07/06 |
Requirements for the Distribution and Possession of Tritium Exit Signs and the Requirements in 10 CFR 31.5 and 32.51a |
RIS-06-024 |
12/06/06 |
Revised Review and Transmittal Process for Accident Sequence Precursor Analyses |
RIS-06-023 |
12/06/06 |
Post-tornado Operability of Ventilating and Air-conditioning Systems Housed in Emergency Diesel Generator Rooms |
RIS-06-022 |
11/15/06 |
Lessons Learned from Recent 10 CFR Part 72 Dry Cask Storage Campaign |
RIS-06-021 |
09/28/06 |
Improving Response Capabilities Through the Use of an Incident Response Electronic Library |
RIS-06-020 |
09/14/06 |
Guidance for Receiving Enforcement Discretion When Concentrating Uranium at Community Water Systems |
RIS-06-019 |
09/14/06
|
Availability of Guidance on Radioactive Seed Localization |
RIS-06-018 |
08/31/06 |
Requesting Exemption from the Public Dose Limits for Certain Caregivers of Hospital Patients |
RIS-06-017 |
08/24/06 |
NRC Staff Position on the Requirements of 10 CFR 50.36, "Technical Specifications,” Regarding Limiting Safety System Settings During Periodic Testing and Calibration of Instrument Channels |
RIS-06-016 |
08/15/06 |
Transfer of the Management Oversight of Certain NRC Region I Licensees in Mississippi to the NRC Region IV Office |
RIS-06-015 |
08/14/06
|
Preparation and Scheduling of Operator Licensing Examinations |
RIS-06-014 |
09/22/06 |
Enforcement Discretion for Facility Changes Under 10 CFR 70.72(c)(2) |
RIS-06-013 |
07/31/06 |
Information on the Changes Made to the Reactor Oversight Process to More Fully Address Safety Culture |
RIS-06-012 |
07/19/06 |
Endorsement of Nuclear Energy Institute Guidance "Enhancements to Emergency Preparedness Programs for Hostile Action" |
RIS-06-011 |
07/20/06 |
Requesting Quality Assurance Program Approval Renewals Online By Electronic Information Exchange |
RIS-06-010 |
06/30/06 |
Regulatory Expectations with Appendix R Paragraph III.G.2 Operator Manual Actions |
RIS-06-009 |
06/21/06 |
NRC's Procedures for Review of Decommissioning Funding Assurance Reports |
RIS-06-008 |
06/12/06 |
Publicly Available Cover Letters for Security-Related Inspection Report |
RIS-06-007 |
06/12/06 |
Changes to the Safety System Unavailability Performance Indicators |
RIS-06-006 |
05/31/06 |
New Reactor Standardization Needed to Support the Design-Centered Licensing Review Approach |
RIS-06-005 |
04/20/06 |
Withdrawal of Transportation Safeguards Advisories SA-01-01, Rev. 1 and SA-03-02 |
RIS-06-004 |
03/07/06 |
Experience With Implementation of Alternative Source Terms |
RIS-06-003 |
02/24/06 |
Guidance On Requesting an Exemption From Biennial Emergency Prepareness Exercise Requirements |
RIS-06-002 |
02/23/06 |
Good Practices For Licensee Performance During The Emergency Prepareness Conponent of Force-On-Force Exercises |
RIS-06-001 |
01/24/06
|
Expiration Date for NRC-Approved Spent Fuel Transportation Routes |