Document Number |
Date |
Title |
RIS-05-031 |
12/22/05
|
Control of Security-Related Sensitive Unclassified Non-Safeguards Information Handled by Individuals, Firms, and Entities Subject to NRC Regulation of the Use of Source, Byproduct, and Special Nuclear Material |
RIS-05-030 |
12/20/05 |
Clarification of Post-Fire Safe-Shutdown Circuit Regulatory Requirements |
RIS-05-029 |
12/14/05 |
Anticipated Transients That Could Develop into More Serious Events |
RIS-05-028 |
11/22/05 |
Scope of For-Cause Fitness-for-Duty Testing Required by 10 CFR 26.24(a)(3) |
RIS-05-027 REV.1 |
01/13/06 |
NRC Timeliness Goals, Prioritization of Incoming License Applications and Voluntary Submittal of Schedule for Future Actions for NRC Review |
RIS-05-026 |
11/07/05 |
Control of Sensitive Unclassified Nonsafeguards Information Related to Nuclear Power Reactors |
RIS-05-025 SUP. 1 |
05/29/07 |
Clarification of NRC Guidelines for Control of Heavy Loads |
RIS-05-025 |
10/31/05 |
Clarification of NRC Guidelines for Control of Heavy Loads |
RIS-05-024 |
11/23/05 |
Control of Radiation Dose to Visitors of Hospital Patients |
RIS-05-023 |
10/07/05 |
Clarification of the Physical Presence Requirement During Gamma Stereotactic Radiosurgery Treatments |
RIS-05-022 |
10/28/05 |
Requirements for the Physical Protection During Transportation of Special Nuclear Material of Moderate and Low Strategic Significance: 10 CFR Part 73 Vs. Regulatory Guide 5.59 (1983) |
RIS-05-021 |
11/14/05 |
Clarification of the Reporting Requirements in 10 CFR 20.2201 |
RIS 2005-20, Rev. 1 |
4/16/08 |
Revision to Nrc Inspection Manual Part 9900 Technical Guidance, “Operability Determinations & Functionality Assessments for Resolution of Degraded or Nonconforming Conditions Adverse to Quality or Safety”. Attachment |
RIS-05-019 |
08/24/05 |
Preparation and Scheduling of Operator Licensing Examinations |
RIS-05-018 |
08/25/05 |
Guidance for Establishing and Maintaining
a Safety Conscious Work Environment |
RIS-05-017 |
08/08/05 |
Clarification of Requirements for Application of the
ASME Code Symbol Stamp on Safety-Related Components |
RIS-05-016 |
08/10/05 |
Issuance of NRC Management Directive 8.17, Licensee
Complaints Against NRC Employees |
RIS-05-015 |
08/03/05 |
Reporting Requirements for Damaged Industrial
Radiographic Equipment |
RIS-05-014 |
07/21/05 |
Clarification of Implementing Guidance for Compensatory
Measures Related to Access Authorization Orders |
RIS-05-013 |
07/13/05 |
NRC Incident Response and the National Response Plan |
RIS-05-012 |
07/11/05 |
Transportation of Radioactive Material Quantities of
Concern NRC Threat Advisory and Protective Measures System |
RIS-05-011 |
07/11/05 |
Requirements for Power Reactor Licensees in Possession
of Devices Subject to the General License Requirements of 10 CFR
31.5 |
RIS-05-010 |
06/10/05 |
NRC Regulatory Issue Summary 2005-10: Performance-Based Approach for Associated Equipment
in 10 CFR 34.20 |
RIS-05-008 |
06/06/05 |
NRC Regulatory Issue Summary 2005-08: Endorsement of Nuclear Energy Institute (NEI)
Guidance "Range of Protective Actions for Nuclear Power Plant Incidents" |
RIS-05-007 |
04/19/05 |
NRC Regulatory Issue Summary 2005-07: Compensatory Measures to Satisfy the Fire
Protection Program Requirements |
RIS-05-006 |
04/18/05 |
NRC Regulatory Issue Summary 2005-06: Reporting Requirements for Gauges Damaged
at Temporary Job Sites |
RIS-05-005 |
03/23/05 |
NRC Regulatory Issue Summary 2005-05: Regulatory Issues Regarding Criticality Analyses
for Spent Fuel Pools and Independent Spent Fuel Storage
Installations |
RIS-05-004 |
04/14/05 |
NRC Regulatory Issue Summary 2005-04: Guidance on the Protection of Unattended Openings that
Intersect a Security Boundary or Area |
RIS-05-003 |
02/28/05 |
NRC Regulatory Issue Summary 2005-03: 10 CFR Part 40 Exemptions for Uranium Contained in
Aircraft Counterweights - Storage and Repair |
RIS-05-002 |
02/14/05 |
NRC Regulatory Issue Summary 2005-02:
Clarifying the Process for Making
Emergency Plan Changes |
RIS-05-001 |
02/07/05 |
NRC Regulatory Issue Summary 2005-01:
Changes to Notice of Enforcement Discretion (NOED)
Process and Staff Guidance |