File Name |
Date |
Description |
gl79070 |
12/21/1979 |
Environmental Monitoring for Direct Radiation
|
gl79069 |
12/20/1970 |
Cladding Rupture, Swelling, and Coolant
Blockage as a Result of a Reactor Accident
|
gl79068 |
12/17/1979 |
Audit of Small Break LOCA Guidelines |
gl79067 |
11/29/1979 |
Estimates for Evacuation of Various Areas
Around Nuclear Power Reactors |
gl79066 |
11/27/1979 |
Additional Information Re 11/09/79 Letter
on ECCS Calculations |
gl79065 |
11/27/1979 |
Radiological Environmental Monitoring
Program Requirements - Enclosing Branch
Technical Position, Revision 1 |
gl79064 |
11/23/1979 |
Suspension of All Operating Licenses |
gl79063 |
11/21/1979 |
Upgraded Emergency Plans |
gl79062 |
|
ECCS Calculations on Fuel Cladding |
gl79061 |
11/09/1979 |
Discussion of Lessons Learned Short Term
Requirements |
gl79060 |
11/09/1979 |
Discussion of Lessons Learned Short Term
Requirements |
gl79058 |
|
ECCS Calculations on Fuel Cladding |
gl79057 |
|
Acceptance Criteria for the Mark I Containment
Long Term Program |
gl79056 |
10/30/1979 |
Discussion of Lessons Learned Short Term
Requirements |
gl79055 |
|
Summary of Meeting Held on October 12,
1979 to Discuss Responses to IE Bulletins
79-05C and 79-06C and HPI Termination Criteria |
gl79054 |
|
Containment Purging and Venting During
Normal Operation |
gl79053 |
|
ATWS |
gl79052 |
|
Radioactive Release at North Anna Unit
1 and Lessons Learned |
gl79051 |
10/10/1979 |
Follow-up Actions Resulting from the NRC
Staff Reviews Regarding the TMI-2 Accident
|
gl79050 |
|
Emergency Plans Submittal Dates |
gl79049 |
10/05/1979 |
Summary of Meetings Held on 9/18-20/79
to Discuss Potential Unreviewed Safety Question
on Systems Interaction for B&W Pl |
gl79048 |
10/02/1979 |
Confirmatory Requirements Relating to
Condensation Oscillation Loads for the Mark
I Containment Long Term Program |
gl79047 |
10/02/1979 |
Radiation Training |
gl79046 |
09/27/1979 |
Containment Purging and Venting During
Normal Operation - Guidelines for Valve
Operability |
gl79045 |
09/25/1979 |
Transmittal of Reports Regarding Foreign
Reactor Operating Experiences |
gl79044 |
09/21/1979 |
Referencing 6/29/79 Letter Re Multiple
Equipment Failures |
gl79043 |
|
Reactor Cavity Seal Ring Generic Issue
|
gl79042 |
09/17/1979 |
Potential Unreviewed Question on Interaction
Between Non-Safety Grade Systems and Safety
Grade Systems |
gl79041 |
09/17/1979 |
Compliance with 40 CFR 190, EPA Uranium
Fuel Cycle Standard |
gl79040 |
09/13/1979 |
Follow-up Actions Resulting from the NRC
Staff Reviews Regarding the TMI-2 Accident
|
gl79039 |
08/22/1979 |
Transmitting Division 5 Draft Regulatory
Guide and Value Impact Statement |
gl79038 |
08/22/1979 |
BWR Off-Gas Systems - Enclosing NUREG/CR-0727
|
gl79037 |
08/10/1973 |
Amendment to 10 CFR 73.55 Deferral from
8/1/79 to 11/1/79 |
gl79036 |
08/08/1979 |
Adequacy of Station Electric Distribution
Systems Voltages |
gl79035 |
08/03/1979 |
Regional Meetings to Discuss Impacts on
Emergency Planning |
gl79034 |
07/30/1979 |
New Physical Security Plans (FR 43280-285)
|
gl79033 |
07/30/1979 |
Transmitting NUREG-0576 - Security Training
and Qualification Plans |
gl79032 |
|
Transmitting NUREG-0578, "TMI-2 Lessons
Learned" |
gl79031 |
|
Submittal of Copies of Response to 6/29/79
NRC Request |
gl79030 |
07/18/1979 |
Transmitting NUREG-0472, Revision 2, Draft
Radiological Technical Specifications |
gl79029 |
07/18/1979 |
Transmitting NUREG-0473, Revision 2, Draft
Radiological Effluent Technical Specifications
|
gl79027 |
07/16/1979 |
Operability Testing of Relief and Safety
Relief Valves |
gl79028 |
07/10/1979 |
Evaluation of Semi-Scale Small Break Experiment
|
gl79026 |
|
Upgraded Standard Technical Specification
Bases Program |
gl79025 |
|
Information Required to Review Corporate
Capabilities |
gl79024 |
06/26/1979 |
Multiple Equipment Failures in Safety-Related
Systems |
gl79023 |
06/20/1979 |
NRC Staff Review of Responses to I&E
Bulletin 79-08 |
gl79022 |
06/11/1979 |
Enclosing NUREG-0560, "Staff Report on
the Generic Assessment of Feedwater Transients
in PWRs Designed by B&W |
gl79021 |
06/04/1979 |
Enclosing NUREG/CR 0660, "Enhancement
of on Site Emergency Diesel Generator Reliability"
|
gl79020 |
05/25/1979 |
Cracking in Feedwater Lines |
gl79019 |
05/22/1979 |
NRC Staff Review of Responses to I&E
Bulletins 79-06 and 79-06a |
gl79018 |
05/15/1979 |
Westinghouse Two-Loop NSSS |
gl79017 |
04/18/1979 |
Reliability of Onsite Diesel Generators
at Light Water Reactors |
gl79016 |
03/22/1979 |
Meeting Re Implementation Of Physical
Security Requirements |
gl79015 |
03/21/1979 |
Steam Generators-Enclosing Summary of
Operating Experience with Recirculating
Steam Generators, NUREG-0523 |
gl79014 |
03/15/1979 |
Pipe Crack Study Group - Enclosing NUREG-0531
and Notice |
gl79013 |
03/12/1979 |
Schedule for Implementation and Resolution
of Mark I Containment Long Term Program
|
gl79012 |
03/12/1979 |
ATWS - Enclosing Letter to GE, with NUREG-0460,
Vol. 3 |
gl79011 |
|
Transmitting "Summary of Operating Experience
with Recalculating Steam Generators, January
1979" NUREG-0523 |
gl79010 |
02/28/1979 |
Transmitting Regulatory Guide 2.6 for
Comment |
gl79009 |
02/27/1979 |
Staff Evaluation of Interim Multiple-Consecutive
Safety-Relief Valve Actuations |
gl79008 |
02/20/1979 |
Amendment to 10 CFR 73.55 |
gl79007 |
02/21/1979 |
Seismic (SSE) and LOCA Responses (NUREG-0484)
|
gl79006 |
02/14/1979 |
Contents of the Offsite Dose Calculation
Manual |
gl79005 |
01/26/1979 |
Information Relating to Categorization
of Recent Regulatory Guides by the Regulatory
Requirements Review Committee |
gl79004 |
01/18/1979 |
Referencing 4/14/78 Letter - Modifications
to NRC Guidance "Review and Acceptance of
Spent Fuel Pool Storage and Handling" |
gl79003 |
01/18/1979 |
Offsite Dose Calculation Manual |
gl79002 |
01/09/1979 |
Transmitting Rev. to Entry Control Systems
Handbook (SAND 77-1033), Intrusion Detection
Handbook (SAND 76-0554), and Barrier Penetration Database |
gl79001 |
01/09/1979 |
Interservice Procedures for Instructional
Systems Development - TRADOC |