December 28, 1993


TO:       ALL HOLDERS OF OPERATING LICENSES FOR NUCLEAR POWER REACTORS

SUBJECT:  MODIFICATION OF THE TECHNICAL SPECIFICATION ADMINISTRATIVE CONTROL  
          REQUIREMENTS FOR EMERGENCY AND SECURITY PLANS (Generic Letter 93-07)


The U.S. Nuclear Regulatory Commission (NRC) is issuing this guidance for
changes to technical specifications (TS) to remove the audit of the emergency
and security plans and implementing procedures from the list of responsibil-
ities of the company nuclear audit and review group.  Parts 50 and 73 of
Title 10 of the Code of Federal Regulations (10 CFR) include provisions that
are sufficient to address these requirements (see Enclosure 1).  Also, this
guidance will allow TS changes to remove (1) the review of the emergency and
security plans from the list of responsibilities of the unit review group and
(2) the requirements for the unit review group to review procedures, and
procedure changes, for the implementation of the emergency and security plans,
provided the licensee relocates these requirements to the respective emergency
and security plans.  The NRC developed this line-item TS improvement in
response to a proposal by the Duke Power Company to amend the operating
licenses of its plants.  

Enclosure 2 contains sample TS requirements that have been marked to show the
requirements that may be removed.  Licensees should retain these audit and
review activities in a manner that fully satisfies the regulatory requirements
that are summarized in Enclosure 1.  Although the TS change removes
requirements that are specific with regard to providing a plant operations
perspective in the review and audit of emergency and security plans and
implementing procedures, the NRC staff is not suggesting that licensees remove
reviewers or auditors with this perspective when satisfying the regulatory
requirements for these activities.  

Licensees that plan to adopt this line-item TS improvement are encouraged to
propose TS changes consistent with the enclosed guidance.  NRC project
managers will review the amendment requests to verify that they conform to the
guidance.  Please contact your project manager or the contact indicated herein
if you have any questions on this matter.  

Licensee action to propose TS changes under the guidance of this generic
letter is voluntary.  Therefore, such action is not a backfit under the
provisions of 10 CFR 50.109.  The following information, although not
requested under the provisions of 10 CFR 50.54(f), would help the NRC evaluate
costs and benefits for licensees who propose the TS changes described in this
generic letter:

-  licensee time and costs to prepare the amendment request

-  estimate of the long-term costs or savings accruing from this TS change



9312170111
.

Generic Letter 93-07                 - 2 -                   December 28, 1993


The voluntary information collections contained in this request are covered by
the Office of Management and Budget clearance number 3150-0011, which expires
June 30, 1994.  The public reporting burden for this voluntary collection of
information is estimated to average 40 hours per response, including the time
for reviewing instructions, searching existing data sources, gathering and
maintaining the data needed, and completing and reviewing the collection of
information.  Send comments regarding this burden estimate or any other aspect
of this voluntary collection of information, including suggestions for
reducing this burden, to the Information and Records Management Branch 
(MNBB-7714), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, and
to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-3019,
(3150-0011), Office of Management and Budget, Washington, D.C.  20503.

                                       Sincerely,

                                       /S/'D BY LJCALLAN

                                       L. J. Callan
                                       Acting Associate Director for Projects
                                       Office of Nuclear Reactor Regulation

Enclosures: 
1.  A Summary of Regulatory Requirements
      for Emergency and Security Plan
      in Title 10 of the Code of Federal Regulations
2.  Model Technical Specifications Administrative
      Control Requirements for Security and 
      Emergency Plans
3.  List of Recently Issued NRC Generic Letters

Technical contact:  T. G. Dunning, NRR
                    (301) 504-1189
.

Generic Letter 93-07                                               Enclosure 1

                     A Summary of Regulatory Requirements
                       for Emergency and Security Plans
                in Title 10 of the Code of Federal Regulations

Emergency Plan

Section 50.54(q) includes the following statement:  

  A licensee authorized to possess and operate a nuclear power reactor shall
  follow and maintain in effect emergency plans which meet the standards in 
  50.47(b) and the requirements in Appendix E of this part.

Section V, "Implementing Procedures," of Appendix E to Part 50 includes the
following statement:

  No less than 180 days prior to the scheduled issuance of an operating
  license for a nuclear power reactor or a license to possess nuclear material
  the applicant's detailed implementing procedures for its emergency plan
  shall be submitted to the Commission as specified in 50.4.  Licensees who
  are authorized to operate a nuclear power facility shall submit any changes
  to the emergency plan or procedures to the Commission, as specified in
  50.4, within 30 days of such changes.

Section 50.54(t) includes the following statement:  

  A nuclear power reactor licensee shall provide for the development,
  revision, implementation, and maintenance of its emergency preparedness
  program.  To this end, the licensee shall provide for a review of its
  emergency preparedness program at least every 12 months by persons who have
  no direct responsibility for implementation of the emergency preparedness
  program.  The review shall include an evaluation for adequacy of interfaces
  with State and local governments and of licensee drills, exercises,
  capabilities, and procedures.  The results of the review, along with
  recommendations for improvements, shall be documented, reported to the
  licensee's corporate and plant management, and retained for a period of five
  years.


Security Plan

Section 50.54(p)(1) includes the following statement:  

  The licensee shall prepare and maintain safeguards contingency plan
  procedures in accordance with Appendix C of Part 73 of this chapter for
  effecting the actions and decisions contained in the Responsibility Matrix
  of the safeguards contingency plan.  

.

Generic Letter 93-07                 - 2 -                         Enclosure 1




Section 50.54(p)(3) includes the following statement:

  The licensee shall provide for the development, revision, implementation and
  maintenance [sic] of its safeguards contingency plan.  To this end, the
  licensee shall provide for a review at least every 12 months of the
  safeguards contingency plan by individuals independent of both security
  program management and personnel who have direct responsibility for
  implementation of the security program.  The review must include a review
  and audit of safeguards contingency procedures and practices....  The
  results of the review and audit, along with recommendations for improve
  ments, must be documented, reported to the licensee's corporate and plant
  management, and kept available at the plant for inspection for a period of
  two years.

Section 73.55(b)(3) includes the following statement:  

  The licensee shall have a management system to provide for the development,
  revision, implementation, and enforcement of security procedures.  The
  system shall include:
    (i)  Written security procedures that document the structure of the
  security organization and detail the duties of guards, watchmen, and other
  individuals responsible for security.  The licensee shall maintain a copy of
  the current procedures as a record until the Commission terminates each
  license for which the procedures were developed and, if any portion of the
  procedure is superseded, retain the superseded material for three years
  after each change.
    (ii)  Provisions for written approval of these procedures and any
  revisions to the procedures by the individual with overall responsibility
  for the security functions.  The licensee shall retain each written approval
  as a record for three years from the date of the approval.

Section 73.55(g)(4) includes the following statement:

  The security program must be reviewed at least every 12 months by
  individuals independent of both security program management and personnel
  who have direct responsibility for implementation of the security program. 
  The security program review must include an audit of security procedures and
  practices....  The results and recommendations of the security program
  review, management's findings on whether the security program is currently
  effective, and any actions taken as a result of recommendations from prior
  program reviews must be documented in a report to the licensee's plant
  manager and to corporate management at least one level higher than that
  having responsibility for the day-to-day plant operation.  These reports
  must be maintained in an auditable form, available for inspection, for a
  period of 3 years.

.

Generic Letter 93-07                 - 3 -                         Enclosure 1




Section 73.56(g)(1) includes the following statement:

  Each licensee shall audit its access authorization program within 12 months
  of the effective date of implementation of this program and at least every
  24 months thereafter to ensure that the requirements of this section are
  satisfied.

Section 73.56(g)(2) includes the following statement:

  Each licensee who accepts the access authorization program of a contractor
  or vendor as provided for by paragraph (a)(4) of this section shall have
  access to records and shall audit contractor or vendor programs every 12
  months to ensure that the requirements of this section are satisfied.


Section 73.56(h)(2) includes the following statement:

  Each licensee shall retain records of results of audits, resolution of the
  audit findings and corrective actions for three years.
.

Generic Letter 93-07                                               Enclosure 2


                        Model Technical Specifications
                      Administrative Control Requirements
                       for Security and Emergency Plans
                              (Modified as Shown)

The following model technical specifications are derived from the "Standard
Technical Specifications for Westinghouse Pressurized Water Reactors," 
NUREG-0452, Revision 4a, and are an example for the types of changes that may
be proposed for plant TS that are different in wording or format.


6.5.1 [UNIT REVIEW GROUP (URG)]

RESPONSIBILITIES

6.5.1.1 through 6.5.1.5  (No change.)

6.5.1.6  The [URG] shall be responsible for:

   a. through h.  (No change.)

   i.   Not used. * (Previously read: Review of the Security Plan and
        implementing procedures and submittal of recommended changes to the
        [Company Nuclear Review and Audit Group];)

   j.   Not used. (Previously read: Review of the Emergency Plan and
        implementing procedures and submittal of recommended changes to the
        [Company Nuclear Review and Audit Group];)  

   k. and l.  (No change.)


6.5.2 [COMPANY NUCLEAR REVIEW AND AUDIT GROUP (CNRAG)]

6.5.2.1 through 6.5.2.7  (No change.)

AUDITS

6.5.2.8  Audits of unit activities shall be performed under the cognizance of
the [CNRAG].  These audits shall encompass:

   a. through d.  (No change.)

   e.   Not used. (Previously read: The Security Plan and implementing
        procedures at least once per 24 months.)


   f.   Not used. (Previously read: The Emergency Plan and implementing
        procedures at least once per 24 months.)

   g. through j.  (No change.)

 _______________
 *Deleted sections are noted as "Not used" to avoid renumbering sections.

.

Generic Letter 93-07                 - 2 -                         Enclosure 2




6.8  PROCEDURES AND PROGRAMS

6.8.1  Written procedures shall be established, implemented, and maintained
covering the activities referenced below:

   a. and b.  (No change.)

   c.   Not used. (Previously read: Security Plan implementation.)

   d.   Not used. (Previously read: Emergency Plan implementation.)

   e. through g.  (No change.)

6.8.2  Each procedure of Specification 6.8.1, and change thereto, shall be
reviewed by the [URG] and shall be approved by the [Plant Superintendent]
prior to implementation and reviewed periodically as set forth in administra-
tive procedures.  (No change.)


   (The requirements of Specifications 6.5.1.6 for items i and j and 6.8.1 for
   items c and d and the provisions of Specification 6.8.2 are to be relocated
   to the security and emergency plans as applicable.)