skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Generic Letters
2008
2007
2006
2005
2004
2003
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979
1978
1977

Generic Letters - 1981

File Name Date Description
gl81037 12/29/1981 ODYN Code Reanalysis Requirements
gl81040 12/16/1981 Qualifications of Reactor Operators
gl81039 11/30/1981 NRC Volume Reduction Policy
gl81038 11/10/1981 Storage of Low Level Radioactive Wastes at Power Reactor Sites
gl81036 09/29/1981 Revised Schedule for Completion of TMI Action Plan Item II.D.1, Relief and Safety Valve Testing
gl81034 08/31/1981 Safety Concerns Associated With Pipe Breaks in the BWR Scram System
gl81035 08/31/1981 Safety Concerns Associated With Pipe Breaks in the BWR Scram System
gl81033   Technical Specification for Station Batteries Multiplant Action
gl81032 08/07/1981 NUREG-0737, Item II.K.3.44-Evaluation of Anticipated Transients Combined With Single Failure
gl81029 08/07/1981 Simulator Examinations
gl81031   Small Break LOCA Confirmatory Integral Systems Experiments for B&W Designed Plants
gl81030 07/31/1981 Safety Concerns Associated With Pipe Breaks in the BWR Scram System
gl81028 07/31/1981 Steam Generator Overfill
gl81026 07/14/1981 Licensing Requirements for Pending Construction Permit and Manufacturing License Applications
gl81027 07/09/1981 Privacy and Proprietary Material in Emergency Plans
gl81023a 07/06/1981 INPO Evaluation Reports
gl81025 06/15/1981 Change in Implementing Schedule For Submission and Evaluation of Upgraded Emergency Plans
gl81024 06/15/1981 Multi-Plant Issue B-56 Control Rods Fail To Fully Insert
gl81023 06/04/1981 INPO Plant Specific Evaluation Reports
gl81016 06/01/1981 NUREG-0737 Item I.C.1 SER on Abnormal Transient Operating Guidelines (ATOG)
gl81013 05/28/1981 SER For GEXL Correlation For 8X8R Fuel Reload Applications For Appendix D Submittals of The GE Topical Report
gl81022 05/05/1981 Engineering Evaluation of The H.B. Robinson Reactor Coolant System Leak on 1/29/81
gl81021 05/05/1981 Natural Circulation Cooldown
gl81001 05/04/1981 Qualification of Inspection, Examination, Testing and Audit Personnel
gl81019 04/20/1981 Thermal Shock to Reactor Pressure Vessels
gl81020 04/10/1981 Safety Concerns Associated With Pipe Breaks in The BWR Scram System
gl81018 03/30/1981 BWR Scram Discharge System-Clarification of Diverse Instrumentation Requirements
gl81015 03/10/1981 Environmental Qualification of Class 1E Electrical Equipment-Clarification of Staffs Handling of Proprietary Information
gl81017 03/05/1981 Functional Criteria for Emergency Response Facilities
gl81011 02/29/1981 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking (NUREG-0619)
gl81003 02/26/1981 Implementation of NUREG-0313,Technical Report on Material Selection& Processing GL For BWR Coolant Press Boundary Piping
gl81006 02/26/1981 Periodic Updating of Final Safety Analysis Reports (FSARS)
gl81004 02/25/1981 Emergency Procedures And Training For Station Blackout Events
gl81012 02/20/1981 Fire Protection Rule (45 FR 76602, 11/19/80)
gl81010 02/18/1981 Post-TMI Requirements For The Emergency Operations Facility
gl81014 02/10/1981 Seismic Qualifications for Auxiliary Feedwater Systems
gl81007 02/03/1981 Control of Heavy Loads
gl81008 01/29/1981 Odyn Code
gl81002 01/27/1981 Analysis, Conclusions and Recommendations Concerning Operator Licensing
gl81009 01/23/1981 BWR Scram Discharge System
gl81005 01/19/1981 Information Regarding The Program For Environmental Qualification Of Safety-Related Electrical Equipment


Privacy Policy | Site Disclaimer
Monday, February 19, 2007