File Name |
Date |
Description |
gl89001s1 |
11/14/1990 |
NUREG-1301 -- "Offsite Dose Calculation
Manual Guidance: Standard Radiological Effluent
Controls for Pressurized Water Reactors" |
gl89010s3 |
10/25/1990 |
Consideration of the Results of NRC-Sponsored
Tests of Motor-Operated Valves |
gl89023 |
10/23/1989 |
NRC Staff Responses to Questions Pertaining
to Implementation of 10 CFR Part 26 |
gl89022 |
10/19/1989 |
Potential for Increased Roof Loads...Due
to Recent Change in Probable Maximum Precipitation
Criteria... |
gl89021 |
10/19/1989 |
Request for Information Concerning Status
of Implementation of Unresolved Safety Issue
(USI) Requirements |
gl89020 |
09/26/1989 |
Protected Area Long-Term Housekeeping
|
gl89019 |
09/20/1989 |
Request for Actions Related to Resolution of Unresolved Safety Issue A-47 "Safety Implication of Control Systems in LWR Nuclear Power Plants"
Pursuant to 10 CFR 50.54(f) |
gl89017 |
09/06/1989 |
Planned Administrative Changes to the
NRC Operator Licensing Written Examination
Process |
gl89018 |
09/06/1989 |
Resolution of Unresolved Safety Issues
A-17, "Systems Interactions in Nuclear Power
Plants" |
gl89016 |
09/01/1989 |
Installation of a Hardened Wetwell Vent
|
gl89014 |
08/21/1989 |
Line-Item Improvements in Technical Specifications
- Removal of 3.25 Limit on Extending Surveillance
Intervals |
gl89015 |
08/21/1989 |
Emergency Response Data System |
gl89007s1 |
08/21/1989 |
Power Reactor Safeguards Contingency Planning
for Surface Vehicle Bombs |
gl89010s2 |
08/03/1990 |
Availability of Program Descriptions |
gl89011 |
06/30/1989 |
Resolution of Generic Issue 101 "Boiling
Water Reactor Water Level Redundancy" |
gl89012 |
07/06/1989 |
Operator Licensing Examination |
gl89013 |
07/18/1989 |
Service Water System Problems Affecting
Safety-Related Equipment |
gl89010s5 |
06/28/1993 |
Inaccuracy of Motor-Operated Valve Diagnostic
Equipment |
gl89010 |
06/28/1989 |
Safety-Related Motor-Operated Valve Testing
and Surveillance |
gl89010s1 |
06/13/1990 |
Results of the Public Workshops |
gl89009 |
05/08/1989 |
ASME Section III Component Replacements
|
gl89008 |
05/02/1989 |
Erosion/Corrosion-Induced Pipe Wall Thinning
|
gl89007 |
04/28/1989 |
Power Reactor Safeguards Contingency Planning
for Surface Vehicle Bombs |
gl89006 |
04/12/1989 |
Task Action Item I.D.2 - Safety Parameter
Display System - 10 CFR 50.54 (f) |
gl89013s1 |
04/04/1990 |
Service Water System Problems Affecting
Safety-Related Equipment |
gl89005 |
04/04/1989 |
Pilot Testing of the Fundamentals Examination
|
gl89004s1 |
04/04/1995 |
Guidance on Developing Acceptable Inservice
Testing Programs |
gl89004 |
04/03/1989 |
Guidance on Developing Acceptable Inservice
Testing Programs |
gl89003 |
03/24/1989 |
Operator Licensing Examination Schedule
|
gl89002 |
03/21/1989 |
Actions to Improve the Detection of Counterfeit
and Fraudulently Marketed Products |
gl89010s6 |
03/08/1994 |
Information on Schedule and Grouping,
and Staff Responses to Additional Public
Questions |
gl89010s4 |
02/12/1992 |
Consideration of Valve Mispositioning
in Boiling Water Reactors |
gl89001 |
01/31/1989 |
Implementation of Programmatic and Procedural
Controls for Radiological Effluent Technical
Specifications |
gl89010s7 |
01/24/1996 |
Consideration of Valve Mispositioning
in Pressurized-Water Reactors |