SUBJECT: | STAFF REQUIREMENTS - AFFIRMATION SESSION, 1:30 P.M., THURSDAY, MAY 25, 2000, COMMISSIONERS' CONFERENCE ROOM, ONE WHITE FLINT NORTH, ROCKVILLE, MARYLAND (OPEN TO PUBLIC ATTENDANCE)(1) |
I. | SECY-99-0282 - Hydro Resources, Inc., Docket No. 40-8968-ML, Memorandum and Order (Financial Assurance for Decommissioning Issues), LBP-99-13, 49 NRC 233 (March 9, 1999); and Memorandum and Order (Motion to Hold in Abeyance), LBP-99-40 (October 19, 1999) |
The Commission approved a Memorandum and Order related to an informal adjudicatory proceeding concerning a Part 40 source and byproduct materials license authorizing Hydro Resources, Inc. (HRI) to construct and operate in situ leach (ISL) mining facilities for a five-year period (1998-2003) at certain sites in Church Rock and Crownpoint, New Mexico, after meeting certain license conditions. The Eastern Navajo Diné Against Uranium Mining (ENDAUM), the Southwest Research and Information Center (SRIC), Marilyn Morris, and Grace Sam (intervenors) oppose the grant of HRI's license.
The Memorandum and Order 1) modifies the ruling in LBP-99-13 regarding financial assurance, places a condition on the license issued to HRI, and remands the case to the Presiding Officer for further proceedings; 2) grants HRI's September 3rd Motion to Strike; 3) denies as moot HRI's September 14th Motion to Strike; 4) denies HRI's September 14th Motion for Sanctions; and 5) denies intervenors' request for oral argument.
(Subsequently, on May 25, 2000, the Secretary signed the Memorandum and Order.)
II. | SECY-00-0080 - Final Rule:"Elimination of the Requirement for Noncombustible Fire Barrier Penetration Seal Materials and Other Minor Changes" (10 CFR Part 50) |
The Commission approved a final rule amending 10 CFR 50.48 and 10 CFR Part 50, Appendix R, to eliminate the noncombustibility requirement for fire barrier penetration seal materials and making other minor changes. The Commission approved the publication and implementation of this final rule, subject to the attached changes.
Following incorporation of these changes, the Federal Register notice should be reviewed by the Rules Review and Directives Branch in the Office of Administration and forwarded to the Office of the Secretary for signature and publication.
(EDO) | (SECY Suspense: 6/23/00) |
The staff should reflect the rule changes in the Standard Review Plan Section 9.5.1, "Fire Protection Program," and in the draft Regulatory Guide DG-1094, "Fire Protection for Operating Nuclear Power Plants," as part of the next regularly scheduled update.
Attachment: As stated
cc: | Chairman Meserve Commissioner Dicus Commissioner Diaz Commissioner McGaffigan Commissioner Merrifield EDO OGC CIO CFO OCAA OCA OIG OPA Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail) PDR - Advance |
1. Section 201 of the Energy Reorganization Act, 42 U.S.C. Section 5841, provides that action of the Commission shall be determined by a "majority vote of the members present." Commissioner Dicus was not present when these items were affirmed. Accordingly the formal vote of the Commission was 4-0 in favor of these decisions. Commissioner Dicus, however, had previously indicated that she would approve these papers and had she been present she would have affirmed her prior votes.