skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

May 17, 2000

MEMORANDUM TO:      William D. Travers
Executive Director for Operations
FROM: Annette L. Vietti-Cook, Secretary /RA/
SUBJECT: STAFF REQUIREMENTS - SECY-00-0049 - RESULTS OF THE REVISED REACTOR OVERSIGHT PROCESS PILOT PROGRAM (Part 2)

In a Staff Requirements Memorandum dated March 28, 2000, the Commission approved the initial implementation of the revised reactor oversight process (RROP) and termination of the Systematic Assessment of Licensee Performance (SALP) process. The SRM (Part 1) indicated that this follow up SRM (Part 2) containing more detailed Commission guidance would be forthcoming.

The full-scale initial implementation of the RROP will inevitably reveal issues that were not exposed in the pilot program. The staff should anticipate that adjustments - perhaps significant adjustments - will be necessary as the program unfolds. As a result, there should be a continuing open dialogue with NRC licensees, other stakeholders, and staff, as issues are encountered. The staff should keep the Commission informed and should promptly bring issues of policy significance to the Commission for resolution. In refining the RROP, the staff should consider the general issues discussed below:

General

The Commission approved the staff's recommendations regarding resolution of the three "Issues of Note;" 1) addressing cross-cutting issues and programmatic breakdowns in the RROP, 2) eliminating the containment leakage performance indicator and addressing the barrier integrity PIs during the first year of RROP implementation, and 3) treating inspection findings involving licensee performance issues that are outside the licensing and design basis of the plant in accordance with the Action Matrix, while ensuring all requirements for backfitting a licensee are met before imposing any new regulatory requirements. In addressing the "Issues of Note," the staff should consider the issues discussed below:

Issue of Note 1: Crosscutting Issues and Programmatic Breakdowns

Issue of Note 3: Performance Issues Outside Licensing and Design Basis

The staff should report on implementation of the RROP results after the first year of use.

(EDO) (SECY Suspense:     6/29/01)

cc: Chairman Meserve
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
OGC
CIO
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR