skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

December 21, 1998

MEMORANDUM TO: William D. Travers
Executive Director for Operations
FROM: John C. Hoyle, Secretary
SUBJECT: STAFF REQUIREMENTS - SECY-98-248 - PROPOSED GENERIC LETTER 98-XX "STEAM GENERATOR TUBE INTEGRITY"

This is to advise you that the Commission has not objected to:

  1. delaying issuance of the proposed generic letter while the staff works with industry to reach agreement on NEI 97-06.

  2. releasing the Draft Regulatory Guide DG-1074 for public comment.

  3. releasing the Differing Professional Opinion (DPO) Consideration Document and the Memorandum dated September 25, 1998, to the Commission from J. Hopenfeld.

The public notice should make it clear that the staff has not had the opportunity to respond to the September 25, 1998, memorandum from J. Hopenfeld and that it will do so as part of the staff's response to public comments.

While DG-1074 is out for public comment, the staff should ensure that it is not used in inspections.

cc: Chairman Jackson
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
OGC
CIO
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR
DCS