February 21, 2001
MEMORANDUM TO: |
William D. Travers
Executive Director for Operations |
|
Karen D. Cyr
General Counsel |
FROM: |
Annette L. Vietti-Cook, Secretary /RA/ |
SUBJECT: |
STAFF REQUIREMENTS - SECY-01-0010 - COORDINATION WITH THE U.S. ARMY
CORPS OF ENGINEERS ON CERTAIN DECOMMISSIONING SITES |
This is to advise you that the Commission has not objected to the staff's
proposal to 1) send a letter to the U.S. Army Corps of Engineers (USACE
)
explaining that NRC would suspend Stepan's license while the USACE decommissions
the site, 2) develop an MOU with USACE, and 3) use the license suspension
approach as an acceptable alternative for future similar cases involving
the USACE remediation of FUSRAP sites licensed by the NRC. The staff should
note the corrections to SECY paper in the attachment.
Without delaying action to suspend the license for the Stepan site, OGC
in consultation with the staff should perform an analysis of the viability
of using an administrative stay and/or enforcement discretion as an acceptable
alternative when a federal government agency is responsible for site clean-up
at NRC licensed sites with the potential for dual regulation.
|
(OGC/EDO) |
(SECY Suspense: 4/9/01) |
cc: |
Chairman Meserve
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
OGC
CIO
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR |
SECY Note: |
To be made publicly available 5 business days after the letter is
dispatched. |
ATTACHMENT
Corrections to the SECY Paper
- In attachment 1, page 3, 2nd bullet from the top, change
'sievert' to 'millisievert'.
- In attachment 5, the response to Question 2, line 2, change 'license'
to 'licensed'
|