skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

June 29, 1999

MEMORANDUM TO: William D. Travers
Executive Director for Operations
FROM: Annette Vietti-Cook, Secretary /s/
SUBJECT: STAFF REQUIREMENTS - SECY-99-008 - RULEMAKING PLAN, "PHYSICAL SECURITY/ SAFEGUARDS FOR PERMANENTLY SHUTDOWN POWER REACTORS," FOR AMENDMENTS TO 10 CFR PART 73

The Commission has approved the rulemaking plan for physical security and safeguards requirements for permanently shutdown power reactors as outlined in option 3 of the attachment to the subject paper. Consistent with the Staff Requirements Memorandum -- Commission Briefing on Part 50 Decommissioning Issues (M990317C) on March 17, 1999, dated June 23, 1999, this rule should be considered in the context of the integrated, risk-informed decommissioning rulemaking initiative. Additionally, the staff should ensure that outstanding generic technical concerns (i.e., high burnup fuel, high density fuel storage configurations, etc.) are appropriately resolved and coordinated with the integrated review initiative.

(EDO) (SECY Suspense:   7/30/99)

The staff, in considering the performance-based approach, should evaluate physical protection requirements (including for the vehicle barrier system) against the existing threat which should be periodically updated, or updated based on credible threat information.

cc: Chairman Jackson
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
Commissioner Merrifield
OGC
CIO
CFO
OCA
OIG
OPA
Office Directors, Regions, ACRS, ACNW, ASLBP (via E-Mail)
PDR
DCS