![]() |
Search Options | |||
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us | ![]() |
March 18, 2002
SCHEDULE AND OUTLINE FOR DISCUSSION
491st ACRS MEETING
APRIL 11-13, 2002
THURSDAY APRIL 11, 2002, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | ||||
1) | 8:30 - 8:35 A.M. | Opening Remarks by the ACRS Chairman (Open) | ||
1.1) | Opening statement (GEA/JTL/SD) | |||
1.2) | Items of current interest (GEA/SD) | |||
1.3) | Priorities for preparation of ACRS reports (GEA/JTL/SD) | |||
2) | 8:35 - 10:30 A.M. | Final Review of the Turkey Point License Renewal Application (Open) (MVB/RE/SD) | ||
2.1) | Remarks by the Subcommittee Chairman | |||
2.2) | Briefing by and discussions with representatives of the NRC staff and the Florida Power and Light Company regarding the license renewal application for Turkey Point Units 3 and 4, and the associated staff's Safety Evaluation Report (SER). | |||
10:30 - 10:45 A.M. |
***BREAK*** | |||
3) | 10:45 - 12:30 P.M. | Advanced Reactor Research Plan (Open) (TSK/MME) | ||
3.1) | Remarks by the Subcommittee Chairman | |||
3.2) | Briefing by and discussions with representatives of the Office of Nuclear Regulatory Research (RES) regarding RES' draft Advanced Reactor Research Plan. | |||
12:30 - 1:30 P.M. |
***LUNCH*** | |||
4) | 1:30 - 3:30 P.M. | CRDM Penetration Cracking and Reactor Pressure Vessel Head Degradation (Open) (FPF/MWW) | ||
4.1) | Remarks by the Subcommittee Chairman | |||
4.2) | Briefing by and discussions with representatives of the NRC staff and industry, including Davis-Besse regarding issues related to the investigation of circumferential cracks in PWR control rod drive mechanism (CRDM) penetration nozzles and weldments, and reactor pressure vessel head degradation at the Davis-Besse Nuclear Power Plant. | |||
Other interested parties may provide their views, as appropriate. | ||||
3:30 - 3:50 P.M. | ||||
5) | 3:50 - 5:15 P.M. | Westinghouse Owners Group (WOG) and Electric Power Research Institute (EPRI) Initiatives Related to Risk-Informed Inservice Inspection of Piping (Open) (WJS/FPF/TJK/SD) | ||
5.1) | Remarks by the Subcommittee Chairman | |||
5.2) | Briefing by and discussions with representatives of the NRC staff regarding the staff's draft safety evaluation reports on WOG and EPRI addendums to their topical reports (WCAP-14572 and EPRI TR-112657) for risk-informed inservice inspection of piping, including extension of risk-informed methods to the break exclusion region piping. | |||
Representatives of WOG and EPRI may provide their views, as appropriate. | ||||
5:15 - 5:30 P.M. | ||||
6) | 5:30 - 7:00 P.M. | Proposed ACRS Reports (Open) | ||
6.1) | Final Review of the Turkey Point License Renewal Application (MVB/RE/SD) | |||
6.2) | Advanced Reactor Research Plan (TSK/MME) | |||
6.3) | Circumferential Cracking of CRDM and PWR Vessel Head Degradation (FPF/MWW) | |||
FRIDAY APRIL 12, 2002, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | ||||
7) | 8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open) (GEA/JTL/SD) | ||
8) | 8:35 - 10:30 A.M. | General Electric (GE) Nuclear Energy Topical Report: "Constant Pressure Power Uprate" (Open/Closed) (JDS/PAB) | ||
8.1) | Remarks by the Subcommittee Chairman | |||
8.2) | Briefing by and discussions with representatives of the NRC staff and General Electric Nuclear Energy regarding GE Topical Report, "Constant Pressure Power Uprate," and the associated NRC staff's safety evaluation. | |||
NOTE: | A portion of this session may be closed to discuss General Electric proprietary information. | |||
10:30 - 10:50 A.M. | ||||
9) | 10:50 - 11:45 A.M. | Future ACRS Activities/Report of the Planning and Procedures Subcommittee (Open) (GEA/JTL/SD) | ||
9.1) | Discussion of the recommendations of the Planning and Procedures Subcommittee regarding items proposed for consideration by the full Committee during future ACRS meetings. | |||
9.2) | Report of the Planning and Procedures Subcommittee on matters related to the conduct of ACRS business, and organizational and personnel matters relating to the ACRS. | |||
10) | 11:45 - 12:00 Noon | Reconciliation of ACRS Comments and Recommendations (Open)(GEA, et al./SD, et al.) Discussion of the responses from the NRC Executive Director for Operations to comments and recommendations included in recent ACRS reports and letters. | ||
12:00 - 1:00 P.M. | ||||
11) | 1:00 - 7:00 P.M. | Proposed ACRS Reports (Open) Discussion of proposed ACRS reports on: | ||
11.1) | Final Review of the Turkey Point License Renewal Application (MVB/RE/SD) | |||
11.2) | Advanced Reactor Research Plan (TSK/MME) | |||
11.3) | Circumferential Cracking of CRDM and PWR Vessel Head Degradation (FPF/MWW) | |||
11.4) | GE Topical Report, "Constant Pressure Power Uprate" (JDS/PAB) | |||
SATURDAY APRIL 13, 2002, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND | ||||
12) | 8:30 -12:30 P.M. | Proposed ACRS Reports (Open) Continue discussion of proposed ACRS reports listed under Item 11. | ||
13) | 12:30 - 1:00 P.M. | Miscellaneous (Open) (GEA/JTL) Discussion of matters related to the conduct of Committee activities and matters and specific issues that were not completed during previous meetings, as time and availability of information permit. |