skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
MEETING OF THE SUBCOMMITTEE ON
THERMAL-HYDRAULIC PHENOMENA
ROOM T-2B3, 11545 ROCKVILLE PIKE, ROCKVILLE, MARYLAND
July 8, 2003

ACRS Contact: Ralph Caruso (301) 415-8065   
 E-mail: rxc@nrc.gov    

- PROPOSED SCHEDULE -
 
Tuesday, July 8, 2003
 
TOPIC
PRESENTERTIME
   
1.IntroductionGraham Wallis, ACRS  8:30-8:35 am
  • Review goals and objectives
    for this meeting
  
2.ESBWR Design OverviewA. Rao, GE8:35-9:30 am
3.ESBWR Testing and Analysis Program (TAPD)B. Shiralkar, GE9:30-10:15 am
 
**BREAK***
 10:15-10:30 am
4.ESBWR Testing and ScalingR. Gamble, GE10:30-11:40 am
5.ESBWR TRACG QualificationB. Shiralkar, GE11:40-12:00 pm
 
**LUNCH***
 12:00 - 1:00 pm
6.ESBWR TRACG Qualification (Continued)B. Shiralkar, GE1:00-1:30 pm
7.ESBWR TRACG ApplicationY. Cheung, GE1:30-2:15 pm
8.TRACG ReviewR. Landry, NRR 2:15-3:15 pm
 
**BREAK***
 3:15 - 3:30 pm
9.TAPD, Testing and Scaling ReviewM. Razzaque, NRR 3:30 - 4:15 pm
10.Confirmatory Research PlanJ. Staudemeier, RES4:15-4:45 am
11.General Discussion and AdjournmentGraham Wallis, ACRS4:45-5:00 pm

Note:

  • Presentation time should not exceed 50% of the total time allocated for a specific item.
  • Number of copies of presentation materials to be provided to the ACRS - 35.