Contact: | Michael
R. Snodderly (301/415-6927)( mrs1@nrc.gov )
|
| |
| TOPIC | PRESENTER | TIME |
| | | |
I. | Introduction | G.
Wallis, Chairman D. Dorman, RES G. Holahan, NRR | 1:00
p.m. |
II. | Status
and Proposed Resolution Of GSI-191: "Assessment of Debris" Accumulation
on PWR Sump Performance | R. Architzel,
NRR | |
III. | NRC
Documents for Resolution Of GSI-191 | | |
| A. | Draft
Generic Letter 2003-XX: Potential Impact of Debris Blockage On Emergency Recirculation
During Design-Basis Accidents at PWRs - Introduction
- Requested
Action/Information
- NRC/Industry Interactions/Issues
- Follow-up
Actions
| R. Architzel, NRR J. Lehning,
NRR | 1:15 p.m. |
| B. | Draft
Regulatory Guide, DG-1107: "Water Sources for Long-Term Recirculation
Cooling Following A Loss-Of- Coolant Accident" - Background
- Regulatory
Position
- Acceptable Analytical Approaches
| B.
P. Jain, RES D. V. Rao, LANL | 2:15 p.m. |
| C.
| Draft Regulatory Guide, DG-1107: "Water
Sources for Long-Term Recirculation Cooling Following A Loss-Of- Coolant Accident" | B.
P. Jain, RES D. V. Rao, LANL |
|
| **BREAK*** | | 3:30
p.m. |
IV. | NEI
Comments on Resolution og GSI-191 | J.
Butler, NEI | 3:45 p.m. |
| A.
Introduction B. NEI Evaluation Methodology (Ground Rules) C. NEI Guidance
- Coordination With NRC Resolution Approach D. Resolution Schedule | | |
V. | Subcommittee
Caucus | | 4:45
p.m. |
| A. | Comments
on Meeting Presentations | | |
| B. | Follow-on
Actions | | |
| C.
| Decision Regarding Future Action on This Matter
by ACRS | |
|
VI. | Adjourn | | 5:00
p.m. |