THURSDAY, MAY
8, 2003, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
1) | 8:30
- 8:35 A.M. | Opening Remarks by the ACRS
Chairman (Open) |
| | 1.1)
Opening Statement (MVB/JTL/SD) |
| | 1.2)
Items of current interest (MVB/SD) |
2) | 8:35
- 10:30 A.M. | Vessel Head Penetration Cracking and
Degradation (Open) (FPF/JDS/MWW) |
| | 2.1)
Remarks by the Subcommittee Chairman |
| | 2.2)
Briefing by and discussions with representatives of the NRC staff and industry
regarding industry responses to NRC Bulletin 2002-02, "Reactor Pressure Vessel
Head Degradation and Reactor Coolant Pressure Boundary Integrity," Electric
Power Research Institute's Materials Reliability Program's proposed inspection
program, wastage research, and related matters. |
| 10:30-10:45
A.M. | ***BREAK**
|
3) | 10:45
- 12:15 P.M. | Proposed Revisions to Regulatory Guide 1.178
and Standard Review Plan Section 3.9.8 for Risk-Informed Inservice Inspection
of Piping (Open) (WJS/MRS/SD) |
| | 3.1)
Remarks by the Subcommittee Chairman |
| | 3.2)
Briefing by and discussions with representatives of the NRC staff regarding the
proposed revisions to Regulatory Guide 1.178, "An Approach for Plant-Specific,
Risk-Informed Decisionmaking: Inservice Inspection of Piping," and to Standard
Review Plan Section 3.9.8, "Standard Review Plan for the Review of Risk-Informed
Inservice Inspection Applications." |
| | Representatives
of the nuclear industry may provide their views, as appropriate. |
| 12:15
- 1:15 P.M. | ***LUNCH**
|
4) | 1:15
- 2:15 P.M. | Operating Experience Program Effectiveness
(Open) (JDS/RC/MWW) |
| | 4.1)
Remarks by the Subcommittee Chairman |
| | 4.2)
Briefing by and discussions with representatives of the NRC staff regarding ongoing
efforts to improve the agency's Reactor Operating Experience Program. |
5) | 2:15 - 3:15
P.M. | Draft Commission Paper on ACRS Self Assessment
(Open) (MVB/RPS) |
| | Discussion
of the draft Commission Paper regarding ACRS Self Assessment. |
| 3:15
- 3:30 P.M. | ***BREAK***
|
6) | 3:30
- 7:00 P.M. | Preparation of ACRS Reports (Open/Closed) |
| | Discussion
of proposed ACRS reports on: |
| | 6.1)
Advancement of PRA Technology to Improve Risk-Informed Decisionmaking (GEA/HN) |
| | 6.2)
Vessel Head Penetration Cracking and Degradation (FPF/JDS/MWW) |
| | 6.3)
Proposed Revisions to Regulatory Guide 1.178 and SRP Section 3.9.8 for Risk-Informed
Inservice Inspection of Piping (WJS/MRS/SD) |
| | 6.4)
Safeguards and Security (Closed) (GEA/RPS). This session will be held in Room
T-8E8. |
FRIDAY,
MAY 9, 2003, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
7) | 8:30
- 8:35 A.M. | Opening Remarks by the
ACRS Chairman (Open) (MVB/JTL/SD) |
8) | 8:35
- 9:00 A.M. | Subcommittee Report on the Revised Application
for the Mixed Oxide (MOX) Fuel Fabrication Facility (Open) (DAP/MWW/RC)
Report by the Chairman of the Reactor Fuels Subcommittee regarding the Subcommittee's
review of the revised construction authorization application for the MOX Fuel
Fabrication Facility and the staff's proposed Safety Evaluation Report. |
9) | 9:00
- 9:15 A.M. | Subcommittee Report on the Integrated Industry
Initiating Event Performance Indicator (Open) (GEA/MWW) Report by the
Chairman of the Reliability and PRA Subcommittee regarding the Subcommittee's
review of the integrated industry initiating event performance indicator which
is part of the Industry Trends Program. |
10) | 9:15
- 10:15 A.M. | Future ACRS Activities/Report of the Planning
and Procedures Subcommittee (Open) (MVB/JTL/SD) |
| | 10.1)
Discussion of the recommendations of the Planning and Procedures Subcommittee
regarding items proposed for consideration by the full Committee during future
ACRS meetings. |
| | 10.2)
Report of the Planning and Procedures Subcommittee on matters related to the
conduct of ACRS business, including anticipated workload and member assignments. |
11 | 10:15
- 10:30 A.M. | Reconciliation of ACRS Comments and Recommendations
(Open) (MVB, et al./SD, et al.) Discussion of the responses from the
NRC Executive Director for Operations to comments and recommendations included
in recent ACRS reports and letters. |
| 10:30
- 10:45 A.M. | ***BREAK***
|
12 | 10:45
- 12:00 Noon | Preparation of ACRS Reports (Open)
Discussion of proposed ACRS reports listed under Item 6. |
| 12:00
- 1:00 P.M. | ***LUNCH***
|
13) | 1:00
- 6:30 P.M. | Preparation of ACRS Reports (Open)
Continue discussion of proposed ACRS reports listed under Item 6. |
14) | 6:30 - 7:00
P.M. | Miscellaneous (Open) (MVB/JTL) Discussion
of matters related to the conduct of Committee activities and matters and specific
issues that were not completed during previous meetings, as time and availability
of information permit. |