MEETING OF THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
SUBCOMMITTEE ON FIRE PROTECTION
OCTOBER 16-17, 2000
ROCKVILLE, MARYLAND

ACRS CONTACT
Amarjit Singh (axs3@nrc.gov)
301-415-6899

- PROPOSED SCHEDULE -
October 16, 2000

TOPIC SPEAKER TIME
I. Opening Remarks Sieber 8:30-8:35 A.M.
II. BWROG Presentation: Gorman 8:35-10:35A.M.
a. Use of SRVs and Low
Pressure Systems (LPS) as
Redundant SRVs and LPS as
Redundant Safe Shutdown Paths
   
b. Associated Circuit
Analysis for Post-Fire
Safe Shutdown
   

***BREAK***

  10:35-10:50 A.M.
III. NEI Presentation: Emerson 10:50-12:30 P.M.
    Associated Circuit
    Analysis for Post-Fire
    Safe Shutdown

***LUNCH***

  12:30-1:30 P.M.

IV.

RES Presentation: Siu 1:30:-3:30 P.M.
    Research Activities
    in the area of Fire Protection
*** BREAK***
  3:30-3:45 P.M.

V.

NFPA Presentation: Bielen/Snopili 3:45-5:45 P.M.
    Proposed NFPA 805
    Fire Protection Standard
***RECESS***    
October 17, 2000
VI. NRR Presentation:    
a. Use of SRVs and Low
Pressure Systems (LPS) as
Redundant SRVs and LPS as
Redundant Safe Shutdown Paths
Qualls 8:30-9:30 A.M.
b. Associated Circuit Analysis Whitney 9:30-10:30 A.M.

***BREAK***

10:30-10:45 A.M.
c. Proposed NFPA 805
Fire Protection Standard
Connell 10:45-12:00 Noon.

***LUNCH ***

12:00-1:00 P.M.
VII. Inspection Procedures
    for Baseline Inspection
    Fire Protection
Whitney 1:00:-2:00 P.M.
VIII NEI Presentation
    On Inspection Procedures
    for Baseline Fire Protection
Emerson 2 :00-2:45 P.M.
IX Remarks by Subcommittee Members   2:45-3:00 P.M.

***ADJOURN***