ADVISORY COMMITTEE ON REACTOR SAFEGUARDS
JOINT MATERIALS & METALLURGY AND
THERMAL-HYDRAULIC PHENOMENA SUBCOMMITTEE MEETING
STEAM GENERATOR ACTION PLAN (SGAP) -
DIFFERING PROFESSIONAL OPINION (DPO) RELATED ITEMS
FEBRUARY 3 - 4, 2004
ROCKVILLE, MARYLAND

REVISED: January 13, 2004

-PROPOSED SCHEDULE-

ACRS CONTACT: B.P. Jain (301-415-7270 or email: bpj@nrc.gov)

WEDNESDAY, FEBRUARY 3, 2004, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND
TOPIC
PRESENTER APPROX.TIME
       
I. Opening Remarks F. Ford/ G. Wallis, ACRS 8:30- 8:45 a.m
       
II. Overview J. Muscara, RES 8:45-9:00 a m
     
III.

SGAP Items 3.6 -3.8
(Research on NDE of SG tubes)

D. Kupperman, ANL
W. Shack, ANL
L. Lund, NRR

9:00-10:30 a.m.

   
tttt
***BREAK***
tttt 10:30- 10:45 a.m
     
III. SGAP Items 3.6 -3.8
(Continued)
tttt 10:45-12:15 p.m.

   
tttt
***LUNCH***
tttt 12:15-1:15 p.m.
       
IV.

SGAP Items 3.1a-3.j
(SG tube integrity under MSLB )

S. Majumdar, ANL
W. Krotiuk, RES
1:15-3:30 p.m.
       
tttt
***BREAK***
tttt 3:30-3:45 p.m.
       
V. SGAP Item 3.9
(Iodine Spiking Assessment-Status)
M. Hart, NRR 3:45-4:30 p.m.
       
VI. Subcommittee Discussion tttt 4:30-4:45 p.m
       
tttt
***Recess***
tttt 4:45 p.m
       
NOTE:
Presentation time should not exceed 50% of the time allocated for a specific item. The remaining 50% of the time is for Subcommittee questions.
       
WEDNESDAY, FEBRUARY 4, 2004, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND
VII. Opening Remarks F. Ford/G. Wallis 8:30-8:35 a.m.
       
VIII. SGAP Items 3.3(*), 3.4 a-3.4g
(Thermal-Hydraulic conditions during Severe Accident)
C. Boyd, RES
D. Fletcher, ISL
8:35-10:30 a.m.
       
tttt
***BREAK***
tttt 10:30-10:45 a.m.
       
VIII. SGAP Items 3.3(*), 3.4 a-3.4g
(Continued)
tttt 10:45-11:45 a.m.
       
tttt
***LUNCH***
tttt 11:45-1:15 p.m.
       
IX. SGAP Item 3.4h (*)
(Primary System Component Response to Severe Accident Conditions)
S. Majumdar, ANL 1:15-3:15 p.m.
       
tttt
***BREAK***
tttt 3:15-3:30 p.m.
       
X. SGAP Item 3.5(*)
(Integrated Methodology for PRA of Severe Accident Induced SG Containment by-pass)
D. Bradley, SAIC 3:30-5:15 p.m.
       
XI. Subcommittee Discussion tttt 5:15-5:30 p.m
       
tttt Adjourn tttt 5:30 p.m

* Task in progress but not completed

 

NOTE: Presentation time should not exceed 50% of the time allocated for a specific item. The remaining 50% of the time is for Subcommittee questions.