WEDNESDAY, JULY 11, 2001, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
1) |
8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open) |
|
|
1.1) |
Opening statement
(GEA/JTL/HJL/SD) |
|
|
1.2) |
Items of current interest (GEA/SD) |
|
|
1.3) |
Priorities for preparation of ACRS
reports (GEA/JTL/SD) |
2) |
8:35 - 10:00 A.M. |
Proposed Risk-Informed Revisions to 10 CFR 50.46 and Proposed Revisions to
the Framework for Risk-Informing the Technical Requirements of 10 CFR Part
50 (Open) (WJS/GBW/MTM) |
|
|
2.1) |
Remarks by the Subcommittee
Chairman |
|
|
2.2) |
Briefing by and discussions with
representatives of the NRC staff
regarding proposed risk-informed
revisions to 10 CFR 50.46,
"Acceptance Criteria for Emergency
Core Cooling Systems for Light-Water
Nuclear Power Reactors," and
proposed revisions to the framework
for risk-informing the technical
requirements of 10 CFR Part 50. |
|
|
Representatives of the nuclear industry will provide their views, as appropriate. |
|
10:00 - 10:20 A.M. |
***BREAK*** |
3) |
10:20 - 12:00 Noon |
SECY-01-0100, "Policy Issues Related to Safeguards, Insurance, and
Emergency Preparedness Regulations at Decommissioning Nuclear Power
Plants Storing Fuel in Spent Fuel Pools" (Open/Closed) (TSK/MME) |
|
|
3.1) |
Remarks by the Subcommittee
Chairman |
|
|
3.2) |
Briefing by and discussions with
representatives of the NRC staff
regarding SECY-01-0100 and related
matters. |
|
|
Representatives of the nuclear industry will provide their views, as appropriate. |
|
|
[ NOTE: A portion of this session may be closed to discuss safeguards
information.] |
|
12:00 - 1:00 P.M. |
***LUNCH*** |
4) |
1:00 - 2:00 P.M. |
Need to Revise 10 CFR Part 54, "Requirements for Renewal of Operating
Licenses for Nuclear Power Plants" (Open) (MVB/SD) |
|
|
4.1) |
Remarks by the Subcommittee
Chairman |
|
|
4.2) |
Briefing by and discussion with
representatives of the NRC staff and
Nuclear Energy Institute (NEI)
regarding the need to revise 10 CFR
Part 54. |
|
2:00 - 2:15 P.M. |
***BREAK*** |
5) |
2:15 - 3:45 P.M. |
Control Rod Drive Mechanism (CRDM) Cracking (Open/Closed)
(FPF/JDS/MWW/PAB) |
|
|
5.1) |
Remarks by the Subcommittee
Chairman |
|
|
5.2) |
Briefing by and discussions with
representatives of the NRC staff and
NEI regarding the staff and industry
proposals for dealing with CRDM
cracking. |
|
|
[NOTE: A portion of this session may be closed to discuss proprietary
information.] |
6) |
3:45 - 4:15 P.M. |
Break and Preparation of Draft ACRS Reports (Open)
Cognizant ACRS members will prepare draft reports, as needed, for
consideration by the full Committee. |
7) |
4:15 - 7:00 P.M. |
Proposed ACRS Reports (Open)
Discussion of proposed ACRS reports on: |
|
|
7.1) |
Proposed Risk-Informed Revisions to
10 CFR 50.46 and Proposed Revisions
to the Framework for Risk-Informing
the Technical Requirements of 10 CFR
Part 50 (WJS/GBW/MTM) |
|
|
7.2) |
SECY-01-0100 and Related Matters
(TSK/MME) |
|
|
7.3) |
South Texas Project Exemption
Request (JDS/GEA/MWW) |
|
|
7.4) |
Need to Revise 10 CFR Part 54
(MVB/SD) |
|
|
7.5) |
Proposals for Dealing with CRDM
Cracking (FPF/JDS/MWW/PAB)
|
THURSDAY, JULY 12, 2001, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
8) |
8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open) (GEA/JTL/SD) |
9) |
8:35 - 9:45 A.M. |
Draft Individual Plant Examination of External Events (IPEEE) Insights Report
(Open) (GEA/AS) |
|
|
9.1) |
Remarks by the Subcommittee
Chairman |
|
|
9.2) |
Briefing by and discussions with
representatives of the NRC staff
regarding the draft IPEEE Insights
Report (NUREG-1742). |
|
|
Representatives of the nuclear industry will provide their views, as appropriate. |
|
9:45 - 10:00 A.M. |
***BREAK*** |
10) |
10:00 - 11:00 A.M. |
Proposed Resolution of Generic Safety Issues (GSI)-191, "Assessment of
Debris Accumulation on PWR Sump Pump Performance" (Open) (GML/AS) |
|
|
10.1) |
Remarks by the Subcommittee
Chairman |
|
|
10.2) |
Briefing by and discussions with
representatives of the NRC staff
regarding the status of resolution of
GSI-191. |
|
11:00 - 11:15 A.M. |
***BREAK*** |
11) |
11:15 - 12:15 P.M. |
Potential Margin Reductions Associated with Power Uprates
(Open)(GBW/MVB/AWC/PAB) |
|
|
11.1) |
Remarks by the Subcommittee
Chairman |
|
|
11.2) |
Discussions with representatives of the
NRC staff regarding ongoing or
proposed staff activities related to the
development of a Standard Review
Plan for use in the review of power
uprate applications. |
|
12:15 - 1:15 P.M. |
***LUNCH*** |
12) |
1:15 - 2:00 P.M. |
Reactor Oversight Process (Open) (JDS/GEA/MWW) |
|
|
12.1) |
Remarks by the Subcommittee
Chairman |
|
|
12.2) |
Discussion of proposed response to the
following items in the April 5, 2000
Staff Requirements Memorandum: |
|
|
|
- Review the use of performance
indicators (PIs) in the Revised
Reactor Oversight Process (RROP)
to ensure that the PIs provide
meaningful insight into aspects of
plant operation that are important to
safety.
- Review the initial implementation
of the significance determination
processes (SDPs) and assess the
technical adequacy of the SDP to
contribute to the RROP.
|
13) |
2:00 - 2:45 P.M. |
Future ACRS Activities/Report of the Planning and Procedures Subcommittee
(Open) (GEA/JTL/SD) |
|
|
13.1) |
Discussion of the recommendations of
the Planning and Procedures
Subcommittee regarding items
proposed for consideration by the full
Committee during future ACRS
meetings. |
|
|
13.2) |
Report of the Planning and Procedures
Subcommittee on matters related to the
conduct of ACRS business, and
organizational and personnel matters
relating to the ACRS. |
14) |
2:45 - 3:00 P.M. |
Reconciliation of ACRS Comments and Recommendations (Open) (GEA, et
al./SD, et al.) |
|
|
Discussion of the responses from the NRC Executive Director for Operations
to comments and recommendations included in recent ACRS reports and
letters. |
|
3:00 - 3:45 P.M. |
***BREAK*** |
15) |
3:45 - 7:00 P.M. |
Proposed ACRS Reports (Open)
Discussion of proposed ACRS reports on: |
|
|
15.1) |
Proposed Risk-Informed Revisions to
10 CFR 50.46 and Proposed Revisions
to the Framework for Risk-Informing
the Technical Requirements of 10 CFR
Part 50 (WJS/GBW/MTM) |
|
|
15.2) |
SECY-01-0100 and Related Matters
(TSK/MME) |
|
|
15.3) |
South Texas Project Exemption
Request (JDS/GEA/MWW) |
|
|
15.4) |
Need to Revise 10 CFR Part 54
(MVB/SD) |
|
|
15.5) |
Draft IPEEE Insights Report
(GEA/AS) |
|
|
15.6) |
Proposals for Dealing with the CRDM
Cracking (FPF/JDS/MWW/PAB) |
|
|
15.7) |
Potential Margin Reductions
Associated with Power Uprates
(tentative) (GBW/MVB/PAB/AWC)
|
FRIDAY, JULY 13, 2001, CONFERENCE ROOM 2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND |
16) |
8:30 - 8:35 A.M. |
Opening Remarks by the ACRS Chairman (Open) (GEA/JTL/SD) |
17) |
8:35 - 5:30 P.M. |
Proposed ACRS Reports (Open) |
|
(12:00-1:00 P.M. LUNCH) |
Continue discussion of proposed ACRS reports listed under Item 15. |
18) |
5:30 - 6:00 P.M. |
Miscellaneous (Open) (GEA/JTL) |
|
|
Discussion of matters related to the conduct of Committee activities and
matters and specific issues that were not completed during previous meetings,
as time and availability of information permit. |