File Name |
Date |
Description |
cr76007 |
12/17/1976 |
Inadequate Performance by Reactor Operating and Support Staff Members |
cr76006 |
11/22/1976 |
Stress Corrosion Cracks in Stagnant, Low Pressure Stainless Piping Containing Boric Acid Solution at PWRs |
cr76005 |
10/08/1976 |
Hydraulic Shock and Sway Suppressors - Maintenance of Bleed and Lock-up Velocities on ITT Grinnell Models... |
cr76004 |
09/29/1976 |
Neutron Monitor and Flow Bypass Switch Malfunctions |
cr76003 |
09/10/1976 |
Radiation Exposures in Reactor Cavities |
cr76002 |
08/16/1976 |
Relay Failures - Westinghouse BF (ac) and BFD (dc) Relays |
cr76001 |
07/27/1976 |
Crane Hoist Control Circuit Modifications |