Morning Report for November 16, 1999

                       Headquarters Daily Report

                         NOVEMBER 16, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  NOV. 16, 1999

Licensee/Facility:                     Notification:

Iowa Electric Light & Power Co.        MR Number: 3-99-0092
Duane Arnold 1                         Date: 11/15/99
Palo,Iowa                                                                 
Dockets: 50-331
BWR/GE-4                              

Subject: Recirculation Riser Piping Weld Crack Repairs                   
Reportable Event Number: 36416                         

Discussion:

During routine inspections performed on reactor vessel recirculation     
riser piping, the licensee identified two of the eight risers had cracks 
in welds. The cracks were in the safe-end to nozzle portion of the "B"   
and "D"recirculation risers. There were a total of three cracks          
identified. The licensee is currently in the process of performing weld  
over-lays at the crack locations. The plant was shut down on October 22, 
1999, to initiate refueling outage 16. The weld over-lays will be        
completed prior to start-up. Contact: Melvin Leach - (630)829-9705       

Regional Action:

Information Only                                                         

Contact:  Melvyn Leach               (630)829-9705
_
REGION III  MORNING REPORT     PAGE  2          NOVEMBER 16, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0093
Byron 2                                Date: 11/16/99
Byron,Illinois                         SRI via telecon                    
Dockets: 50-455
PWR/W-4-LP                            

Subject: UNIT 2 STARTUP FROM REFUELING OUTAGE                            

Discussion:

Unit 2 was returned to service from refueling outage B2R08. The reactor  
was taken critical at 6:50 a.m. on November 15, 1999, and the main       
generator was synchronized to the electrical grid at 12:05 a.m. on       
November 16, 1999. Major work accomplished during the refueling outage   
included a modification to the digital rod position indication system, an
overhaul of the 2A essential service water pump, replacement of the 2A   
reactor containment fan cooler motor, refurbishment of the 2B low        
pressure turbine, and performance of a containment integrated leak rate  
test.                                                                    

Regional Action:

The resident inspectors monitored the startup activities.                

Contact:  Michael Jordan             (630)829-9637