Morning Report for August 5, 1999

                       Headquarters Daily Report

                         AUGUST 05, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I            X                                      
REGION II                              X                   
REGION III                                                X
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS AUGUST  5, 1999

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-99-0068
Rosemount                              Date: 08/05/99
                                                                          

Subject: Part 21 - Potential problem with Rosemount pre-1987 trip units  

Discussion:

VENDOR: Rosemount                       PT21 FILE NO: 99-31-0            
                                                                         
DATE OF DOCUMENT: 06/18/99              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 35844               REVIEWER: REXB, D. Skeen         
                                                                         
                                                                         
NEW ISSUE. On June 18, 1999, the NRC Operations Center received a letter 
from Rosemount Nuclear Instruments, Incorporated, concerning a potential 
problem with a specific capacitor used in the circuit boards of Model    
510DU and 710DU trip units. These trip units are widely used in BWR      
plants in various applications to provide inputs to the nuclear steam    
supply shutoff system (NSSSS) as well as to provide signals to the       
primary containment isolation system.                                    
                                                                         
On October 8, 1987, the BWR Owners Group (BWROG) Scram Frequency         
Reduction Maintenance Committee requested information from Rosemount     
after a number of BWR utilities experienced failure of the Model 710     
analog trip circuit board due to short circuiting of the power input     
capacitor (designated as C25 on the circuit board).                      
                                                                         
On October 20, 1987, Rosemount responded to the BWROG, explaining that   
the issue had been identified by its internal returned goods tracking    
system. As a result, the vendor performed extensive testing in the spring
of 1987 and determined that the capacitors would only fail when subjected
to environmental parameters (temperature, voltage) outside of normal     
operating conditions. However, the vendor acknowledged that a            
contaminant, such as moisture introduced into the capacitor could cause  
the type of failure described by the customers. In May 1987, the vendor  
upgraded the trip card with a more reliable capacitor with enhanced      
sealing against contamination.  Thus, C25 capacitors with a date code of 
8630 or higher are not susceptible to failure due to contamination.      
                                                                         
Since 1987, the vendor has identified five more confirmed failures of the
pre-8630 C25 capacitors and 14 cases where the capacitor was replaced by 
vendor technicians while repairing trip units, indicating that the       
capacitor may have played a role in their failure. The vendor's June 18, 
1999 letter alerted its BWR customers that further examination of the    
capacitors may be warranted to determine if replacement is necessary.    
Rosemount is preparing a procedure to be made available to customers at  
no charge for licensees who may wish to rework existing trip units.      
                                                                         
NRC staff discussed the issue with Rosemount in a telephone conversation 
on June 21, 1999. Rosemount confirmed that the Model 510 and 710 trip    
units are only used in BWR applications. The vendor stated that the      
4-digit date code on the capacitor is located on one side of the         
capacitor at the bottom of a list of other numbers. The vendor           

HEADQUARTERS      MORNING REPORT     PAGE  2          AUGUST  5, 1999
MR Number: H-99-0068 (cont.)

acknowledged that the capacitor may not always be oriented on the circuit
board to enable easy reading. The vendor is working to identify trip     
units with the pre-8630 date codes by serial number to make it easier for
customers to identify suspect trip units. Once the units have been       
identified by serial number, Rosemount will notify affected customers.   
                                                                         
Contact:    Dave Skeen, NRR                                              
            301-415-1174                                                 
            E-mail: dls@nrc.gov                                          
_
HEADQUARTERS      MORNING REPORT     PAGE  2          AUGUST  5, 1999

MR Number: H-99-0069

                           NRR DAILY REPORT ITEM
                           GENERIC COMMUNICATIONS



Subject: Issuance of Information Notice 99-25

NRC Information Notice 99-25: Year 2000 Contingency Planning Activities  
dated August 10, 1999                                                    
                                                                         
The U.S. Nuclear Regulatory Commission is issuing this information notice
to inform addressees about contingency planning activities being         
undertaken by the NRC in response to potential disruptions of            
telecommunications and electrical distribution systems that could occur  
during the Year 2000 (Y2K) transition period (December 31, 1999, through 
the first few days of 2000).                                             
                                                                         
Technical Contacts: Joseph Giitter, IRO     John Jolicoeur, IRO          
                    301-415-7485            301-415-6383                 
                    E-mail: jgg@nrc.gov     E-mail: jrj1@nrc.gov         
_
HEADQUARTERS      MORNING REPORT     PAGE  3          AUGUST  5, 1999

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-99-0070
Nuclear Logistics Inc.                 Date: 08/05/99
                                                                          

Subject: Part 21 - Potential premature overvoltage protection actuation  
         in dc power supply during diesel generator loading              


Discussion:

VENDOR: Nuclear Logistics           PT21 FILE NO: 99-30-0                
                                                                         
DATE OF DOCUMENT: 06/01/99          ACCESSION NUMBER: 9906070115         
                                                                         
SOURCE DOCUMENT: EN 35782           REVIEWER: REXB, D. Skeen             
                                                                         
NEW ISSUE. The vendor, Nuclear Logistics Incorporated (NLI) reports a    
deviation in a direct current power supply, part number P/N              
NLI-LGS-G-24-OV-R-8018, supplied as a Class 1E component. The observed   
deviation was a premature overvoltage protection actuation during diesel 
generator loading. This condition was determined to be a deviation on    
April 19, 1999, but the vendor has not been able to duplicate the        
condition in laboratory testing. The affected utility is Public Service  
Electric and Gas Company. The vendor notified four other nuclear         
customers, including Florida Power and Light, Baltimore Gas and Electric,
Omaha Public Power District, and Virginia Power Company which also have  
NLI-L Series power supplies, but NLI has not received any other reports  
of power supply problems from those customers.                           
                                                                         
The vendor plans on witnessing testing of the suspect power supplies in  
situ at Public Service Electric and Gas Company later this month to      
determine the root cause of the overvoltage protection circuitry         
actuation. Information provided to NLI by the licensee indicates that the
power supply, designed to provide 50 amps at 24 V-dc and to provide      
protection of the power supply from overvoltage conditions when the      
output voltage exceeds 27V-dc, was installed in the emergency diesel     
generator control panel along with several control relays which are      
required to cycle during diesel generator starting and loading. One      
possible theory is that cycling of the relays may cause voltage spikes in
the power supply of sufficient magnitude to actuate the overvoltage      
protection circuitry and terminate the power supply output.              
                                                                         
The vendor will evaluate the test data, and if it is determined that     
there is a design deficiency, other NLI-L Series power supplies will be  
tested to ascertain their susceptibility to this problem.                
_
REGION I  MORNING REPORT     PAGE  4          AUGUST  5, 1999

Licensee/Facility:                     Notification:

Connecticut Yankee Atomic Power Co.    MR Number: 1-99-0028
Haddam Neck 1                          Date: 08/05/99
Hartford,Connecticut                   Licensee Telecon                   
Dockets: 50-213
PWR/W-4-LP                            

Subject: Stand-Down at Haddam Neck to Raise Safety Awareness             

Discussion:

On August 4, 1999, Bechtel, the Decommissioning Operations Contractor for
the Haddam Neck facility, issued a Stop Work Order. Within the last      
month, many new workers were hired and decommissioning activities were   
initiated. The licensee stated that some of these activities were not    
conducted consistent with Bechtel's expectations, including a few        
recordable OSHA incidents of minor safety significance. As of today      
(August 5), Bechtel has conducted an all-hands meeting to review the work
practices and has conducted feedback sessions with its foreman and work  
crews. Some limited work activities are expected to resume today.        
However, the majority of the work will not resume until the worker       
feedback is evaluated, a hazard assessment is conducted by Bechtel to    
develop a corrective action plan, a detailed pre-job brief is conducted  
with every crew, and a safe work observation program is initiated.  Most 
work is anticipated to resume next week.                                 
                                                                         
The licensee provided a courtesy notification to the NRC and also plans  
to highlight in their daily newsletter the efforts by Bechtel to improve 
safety awareness with its new workers. NRC informed the State of         
Connecticut.                                                             

Regional Action:

NRC will review this matter as part of its routine inspection program    
schedule for next week.                                                  

Contact:  Ronald Bellamy             (610)337-5200
          Marie Miller               (610)337-5205
_