Morning Report for July 30, 1999

                       Headquarters Daily Report

                         JULY 30, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV           X                                      
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  JULY 30, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0066
Braidwood 1 2                          Date: 07/29/99
Braceville,Illinois                    licensee via telecon               
Dockets: 50-456,50-457
PWR/W-4-LP,PWR/W-4-LP                 

Subject: COMMONWEALTH EDISON SENIOR MANAGEMENT CHANGES                   

Discussion:

Effective July 28, 1999, Mr. Chris Crane has been appointed to the new   
position of Senior Vice President, Nuclear Operations. The existing      
Boiling Water Reactor (BWR) Operations and Pressurized Water Reactor     
(PWR) Operations organizations have been combined into one Nuclear       
Operations organization. Mr. Crane was previously Vice President for BWR 
Operations.                                                              
                                                                         
Mr. Gene Stanley has been appointed Vice President, Nuclear Operations.  
Mr. Stanley was previously Vice President for PWR Operations.            

Regional Action:

None.                                                                    

Contact:  MELVYN LEACH               (630)829-9705
_
REGION III  MORNING REPORT     PAGE  2          JULY 30, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0067
Byron 1 2                              Date: 07/29/99
Byron,Illinois                         LICENSEE VIA TELECON               
Dockets: 50-454,50-455
PWR/W-4-LP,PWR/W-4-LP                 

Subject: COMMONWEALTH EDISON SENIOR MANAGEMENT CHANGES                   

Discussion:

Effective July 28, 1999, Mr. Chris Crane has been appointed to the new   
position of Senior Vice President, Nuclear Operations. The existing      
Boiling Water Reactor (BWR) Operations and Pressurized Water Reactor     
(PWR) Operations organizations have been combined into one Nuclear       
Operations organization. Mr. Crane was previously Vice President for BWR 
Operations.                                                              
                                                                         
Mr. Gene Stanley has been appointed Vice President, Nuclear Operations.  
Mr. Stanley was previously Vice President for PWR Operations.            

Regional Action:

None.                                                                    

Contact:  MELVYN LEACH 6308295                    
_
REGION III  MORNING REPORT     PAGE  3          JULY 30, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0068
Dresden 1 2 3                          Date: 07/29/99
Morris,Illinois                        LICENSEE VIA TELECON               
Dockets: 50-010,50-237,50-249
BWR/GE-1,BWR/GE-3,BWR/GE-3            

Subject: COMMONWEALTH EDISON SENIOR MANAGEMENT CHANGES                   

Discussion:

Effective July 28, 1999, Mr. Chris Crane has been appointed to the new   
position of Senior Vice President, Nuclear Operations. The existing      
Boiling Water Reactor (BWR) Operations and Pressurized Water Reactor     
(PWR) Operations organizations have been combined into one Nuclear       
Operations organization. Mr. Crane was previously Vice President for BWR 
Operations.                                                              
                                                                         
Mr. Gene Stanley has been appointed Vice President, Nuclear Operations.  
Mr. Stanley was previously Vice President for PWR Operations.            

Regional Action:

None.                                                                    

Contact:  MELVYN LEACH               (630)829-9705
_
REGION III  MORNING REPORT     PAGE  4          JULY 30, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0069
Quad Cities 1 2                        Date: 07/29/99
Cordova,Illinois                       LICENSEE VIA TELECON               
Dockets: 50-254,50-265
BWR/GE-3,BWR/GE-3                     

Subject: COMMONWEALTH EDISON SENIOR MANAGEMENT CHANGES                   

Discussion:

Effective July 28, 1999, Mr. Chris Crane has been appointed to the new   
position of Senior Vice President, Nuclear Operations. The existing      
Boiling Water Reactor (BWR) Operations and Pressurized Water Reactor     
(PWR) Operations organizations have been combined into one Nuclear       
Operations organization. Mr. Crane was previously Vice President for BWR 
Operations.                                                              
                                                                         
Mr. Gene Stanley has been appointed Vice President, Nuclear Operations.  
Mr. Stanley was previously Vice President for PWR Operations.            

Regional Action:

None.                                                                    

Contact:  MELVYN LEACH               (630)829-9705
_
REGION III  MORNING REPORT     PAGE  5          JULY 30, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0070
La Salle 1 2                           Date: 07/29/99
Marseilles,Illinois                    LICENSEE VIA TELECON               
Dockets: 50-373,50-374
BWR/GE-5,BWR/GE-5                     

Subject: COMMONWEALTH EDISON SENIOR MANAGEMENT CHANGES                   

Discussion:

Effective July 28, 1999, Mr. Chris Crane has been appointed to the new   
position of Senior Vice President, Nuclear Operations. The existing      
Boiling Water Reactor (BWR) Operations and Pressurized Water Reactor     
(PWR) Operations organizations have been combined into one Nuclear       
Operations organization. Mr. Crane was previously Vice President for BWR 
Operations.                                                              
                                                                         
Mr. Gene Stanley has been appointed Vice President, Nuclear Operations.  
Mr. Stanley was previously Vice President for PWR Operations.            

Regional Action:

None.                                                                    

Contact:  MELVYN LEACH               (630)829-9705
_
REGION IV  MORNING REPORT     PAGE  6          JULY 30, 1999

Licensee/Facility:                     Notification:

Portland General Electric Co.          MR Number: 4-99-0021
Trojan 1                               Date: 07/30/99
Ranier,Oregon                                                             
Dockets: 50-344
PWR/W-4-LP                            

Subject: DRY CASK STORAGE WORK HALTED                                    

Discussion:

On July 12, 1999, the licensee initiated loading of their first TranStor 
storage cask with spent fuel. Loading was performed in the cask loading  
pit adjacent and connected to the spent fuel pool. The licensee planned  
to load 34 casks. Each cask is capable of holding 24 spent fuel          
assemblies. Prior to and during loading of the first spent fuel assembly 
into the cask, a brownish coloration of the water in the cask and gas    
bubbles were observed. Provisions were established by the licensee to    
circulate and filter the water from the cask through a demineralizer     
system. However, by the time the eighth spent fuel assembly was loaded,  
the cloudiness problem had progressed to the point that loading was      
stopped. Over the next several days, the licensee experienced additional 
clouding of the water and generation of gas bubbles. The cask loading pit
became cloudy to the point that visibility was less than one foot. A     
second larger demineralizer system and an underwater clean-up system were
placed in operation. Gas bubbles and water samples were collected and    
analyzed. The gas bubbles consisted of hydrogen, oxygen and nitrogen.    
Samples of the cloudy water were found to contain high levels of iron    
oxide. The TranStor cask consisted of a stainless steel shell with carbon
steel internal sleeves. The carbon steel was coated with a special       
coating to prevent interaction of the carbon steel with the borated water
in the spent fuel pool. However, certain areas around welds on the       
sleeves were not coated. This area consisted of about 4% of the surface  
area of the carbon steel. The bubbles and cloudiness were determined to  
be from the interaction of the uncoated carbon steel with the borated    
water. Tests of the coating used on the carbon steel were conducted prior
to qualifying the coating. The tests indicated no interaction between the
coating, when properly applied, and the borated water. However, an       
interaction between carbon steel and borated water was known.            
                                                                         
On July 23, 1999, the water clarity problem was resolved and the cask was
unloaded. The licensee initiated an examination of the cask and found the
carbon steel to be within acceptable tolerances with no significant      
degradation from the interaction with the borated water. However, the    
coating failed the test for adhesiveness. The licensee is currently      
evaluating the situation including submittal of information to the NRC   
for review.                                                              

Regional Action:

NRC personnel will be onsite examining the cask during the week of August
2, 1999.  The licensee has committed to not resume cask loading until    
further evaluation of the coating is completed and necessary information 
is submitted to the NRC.                                                 

Contact:  D. B. Sptizberg            (817)860-8198