Morning Report for April 14, 1999

                       Headquarters Daily Report

                         APRIL 14, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I            X                                      
REGION II                              X                   
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS APRIL 14, 1999

Licensee/Facility:                     Notification:

Florida Power & Light Company          MR Number: H-99-0034
St. Lucie 2                            Date: 04/14/99
                                                                          

Subject: Relief Request for Leaking ECCS Suction Piping                  
         (Reportable Event Number 35550)                                 


Discussion:

On April 6, 1999, St. Lucie, Unit 2, began a shutdown from 100 percent   
power when pinhole leaks were identified in both trains of the ECCS      
suction lines that run from the refueling water tank. The affected piping
runs in a trench from the tank, which is located outdoors, to the ECCS   
pumps.                                                                   
                                                                         
A conference call with the licensee, Region II, and NRR was held to      
discuss the leaking ECCS lines. The leaks were characterized as          
micro-cracks and the evidence of leakage was the appearance of boric acid
crystals on the surface of both the A and B train ECCS suction lines. No 
actual leakage was observed coming from the lines. Subsequent to the     
call, NRR reviewed a licensee submittal assessing the margin in the      
degraded piping and granted the licensee relief from making a code repair
to the ECCS suction lines for a period of two weeks. The licensee        
terminated the plant shutdown at 28 percent power and increased power to 
50 percent until a code repair could be made to the A train piping. The  
licensee subsequently increased power to 100 percent and plans to perform
a code repair on the B train piping by April 17, 1999.                   
                                                                         
Contacts:   Keith Wichman, NRR          Dave Skeen, NRR                  
            (301) 415-2757              (301) 415-1174                   
            E-mail: krw@nrc.gov         E-mail: dls@nrc.gov              
_
REGION I  MORNING REPORT     PAGE  2          APRIL 14, 1999

Licensee/Facility:                     Notification:

Niagara Mohawk Power Corp.             MR Number: 1-99-0014
Nine Mile Point 1                      Date: 04/14/99
Lycoming,New York                      SRI PC                             
Dockets: 50-220
BWR/GE-2                              

Subject: REFUELING OUTAGE                                                

Discussion:

At 7:00 a.m. on April 11, 1999, Niagara Mohawk Power Corporation         
commenced power reduction of Nine Mile Point Unit 1 in preparation for   
the unit's 15th refueling outage.  The main generator was taken off-line 
on April 11 at 1:10 p.m., and the unit was in cold shutdown on April 12, 
at 1:05 a.m.  In addition to refueling activities, major activities      
planned include: installation of emergency core cooling system suction   
strainers, replacement of control rod drive mechanisms, and core shroud  
inspections.  The outage duration is expected to be 45 days with restart 
scheduled for May 22, 1999.                                              

Regional Action:

The resident inspectors are on site monitoring licensee activities.      

Contact:  Gordon Hunegs              (315)342-4041
          Gene Barber                (610)337-5232
_