skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for March 31, 1999

                       Headquarters Daily Report

                         MARCH 31, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II           X                                      
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  MARCH 31, 1999

Licensee/Facility:                     Notification:

                                       MR Number: 2-99-0006
Soil And Materials, Inc.               Date: 03/31/99
Hato Rey,Puerto Rico                                                      
Dockets: 03017121 License No: 52-19193-01  

Subject: REPORTED THEFT OF LICENSED MATERIAL                             

Discussion:

On March 30, 1999, the licensee notified the NRC of the theft and        
subsequent return of a licensee-operated pickup truck carrying a portable
gauging device. The device contained 10 millicuries (mCi) of cesium 137  
and 50 mCi of americium 241. The theft took place on March 30, 1999, at  
about 8:00 a.m. local time (7:00 a.m. EST) at the Gold Villas            
construction site in Vega Alta, Puerto Rico.                             
                                                                         
The gauge technician employed by the licensee reported that two          
individuals were apparently stealing surveying equipment from the job    
site. The individuals approached the employee and car jacked him and his 
vehicle at gunpoint in order to carry the stolen equipment from the job  
site. The gauge was secured in the back of the truck at the time of the  
incident. The licensee employee and vehicle were subsequently released at
about 9:00 a.m. local time. The licensee employee stated that the        
individuals apparently did not notice or touch the gauge and that the    
gauge remained in locked, secure storage in its transportation case      
throughout the incident. The licensee employee was not injured.          
                                                                         
The licensee reported the event to the Vega Alta police department which 
is investigating the incident. The licensee reported that there has been 
no media interest in this event. The Commonwealth of Puerto Rico has been
notified. This information is current as of 11:00 a.m. EST.              

Contact:  JOHN M. PELCHAT            (404)562-4729
_
REGION III  MORNING REPORT     PAGE  2          MARCH 31, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0024
Quad Cities 1 2                        Date: 03/29/99
Cordova,Illinois                       via phone call from licensee       
Dockets: 50-254,50-265
BWR/GE-3,BWR/GE-3                     

Subject: CHANGE IN STATION MANAGER                                       

Discussion:

Quad Cities Station Manager, Bill Pearce, Resigns                        
                                                                         
Mr. L. William (Bill) Pearce, Station Manager for Quad Cities Nuclear    
Power Station, Units 1 & 2 has resigned to pursue new opportunities. Mr. 
Pearce has been the Station Manager at Quad Cities since November, 1994, 
with a short stint as Site Vice President for Quad Cities in late 1997.  
His last official day will be Friday, April 9, 1999.                     
                                                                         
Mr. George Barnes, current Maintenance Manager, will be acting Station   
Manager until a replacement has been found. In early March 1999, Mr.     
Barnes joined the ComEd and Quad Cities organization from Carolina Power 
and Light, where he held various management positions at the Brunswick   
facility. Mr Russell Freeman, current Quad Cities Work Control Manager,  
will assume the position of acting Maintenance Manager along with his    
work control duties. The turnover process between Bill Pearce and George 
Barnes will begin immediately.                                           

Regional Action:

None.                                                                    

Contact:  M. Ring                    (630)829-9703
_