skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for March 23, 1999

                       Headquarters Daily Report

                         MARCH 23, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  MARCH 23, 1999

Licensee/Facility:                     Notification:

Wisconsin Electric Power Co.           MR Number: 3-99-0018
Point Beach 1 2                        Date: 03/17/99
Two Rivers,Wisconsin                   FAX FROM RESIDENT INSPECTOR        
Dockets: 50-266,50-301
PWR/W-2-LP,PWR/W-2-LP                 

Subject: NEW QUALITY ASSURANCE MANAGER                                   

Discussion:

The licensee for Point Beach Nuclear Plant announced that effective April
1, 1999, Mr. Bill Beach will be the station's Nuclear Assurance (quality 
assurance) Manager. He replaces Mr. Rick LaRhette who will return to the 
Institute of Nuclear Power Operations after 21 months at Point Beach.    
Most recently, Mr. Beach served as a member of Point Beach's offsite     
review committee. Before joining Wisconsin Electric, Mr. Beach was the   
NRC Region III Regional Administrator.                                   

Regional Action:

None                                                                     

Contact:  R. D. Lanksbury            (630)829-9631
_
REGION III  MORNING REPORT     PAGE  2          MARCH 23, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0019
Dresden 3                              Date: 03/22/99
Morris,Illinois                        E-Mail from RIO                    
Dockets: 50-249
BWR/GE-3                              

Subject: TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO UNIT 3 PRESSURE
         BOUNDARY LEAKAGE                                                


Discussion:

On March 21, 1999, Dresden operators shut down the Unit 3 reactor due to 
the identification of pressure boundary leakage. Station personnel had   
identified an increase in drywell counts and activity on March 13, 1999. 
Operators also noted a corresponding increase in drywell fluid leakage   
(as identified via drywell sump pumping activities) from approximately   
0.1 gpm to approximately 0.3 gpm. On March 21, 1999, operators reduced   
reactor power to approximately 40 percent power and station personnel    
entered the drywell to identify the source of the leak. The leak was from
a 1 inch welded fitting attached to the "B" reactor recirculation pump   
flow element line. This is the same location as a previous leak in       
November 1997 (ref. LER 50-249/97012). Upon identification that the leak 
was from a pressure boundary, operators commenced a reactor shutdown in  
accordance with Technical Specification requirements. The operators      
initiated a reactor shutdown at 11:15 a.m. and manually scrammed the     
reactor at 1:24 p.m. The operators placed the plant in a cold shutdown   
condition at 7:20 p.m. and exited the LCO for pressure boundary leakage. 
Currently the licensee plans to fix the leak and return to power in an   
expeditious manner. In the longer term, a detailed failure analysis using
metallurgical techniques is planned in order to resolve the repetitive   
failures at this location.                                               

Regional Action:

The resident inspection staff monitored portions of the downpower and    
shutdown activities. The residents also are monitoring the plant outage  
activities.                                                              

Contact:  M. Ring                    (630)829-9703