Morning Report for February 16, 1999

                       Headquarters Daily Report

                         FEBRUARY 16, 1999

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II           X                                      
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS FEB. 16, 1999

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-99-0014
Integrated Resources                   Date: 02/16/99
                                                                          

Subject: Part 21 - Premature failure of square root converters           

Discussion:

VENDOR: Integrated Systems             PT21 FILE NO: 99-09-0             
                                                                         
DATE OF DOCUMENT: 01/22/99             ACCESSION NUMBER:                 
                                                                         
SOURCE DOCUMENT: EN 35304              REVIEWER: PECB, V. Hodge          
                                                                         
                                                                         
NEW ISSUE.  The vendor, Integrated Resources, reports failure of five    
square root converters.  The Dresden licensee had sent nine of these     
converters to the vendor for testing and five of them failed.  The vendor
sent them to the manufacturer, Barker Microfarads, for further analysis. 
These items are aluminum electrolytic capacitor devices, Sprague Electric
Model TE1302 of manufacture date code 9322H.                             
                                                                         
The vendor reports that four of these converters are in safety-related   
use, two at Nine Mile Point Unit 1 and two at Fitzpatrick and about one  
hundred of them are in nonsafety-related use at the Dresden and Quad     
Cities stations.  The vendor notified all its affected customers.        
                                                                         
On 09 Feb 99, the vendor confirmed by telephone that the cause of these  
failures is a malfunction of the oversized end seal.  At the time of     
manufacture, the end seal was made larger than would be the case today.  
The seal problem allowed the loss of moisture from the capacitor, causing
the equivalent series resistance to increase, meaning more production of 
heat and further drying.  The anode lead became unbonded from the        
capacitor plate material to shorten the nominal 10 year shelf life of the
device.                                                                  
                                                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  2          FEBRUARY 16, 1999

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-99-0015
Swagelok                               Date: 02/16/99
                                                                          

Subject: Part 21 - Material defect in pipe fitting tee                   

Discussion:

VENDOR: Swagelok                        PT21 FILE NO: 99-10-0            
                                                                         
DATE OF DOCUMENT: 01/29/98              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 35329               REVIEWER: PECB, R. Benedict      
                                                                         
                                                                         
NEW ISSUE.  The vendor, Swagelok, reports a possible material defect in  
the pipe fitting tee, part number SS-6-T and product identification      
number R27GE0123B.  The defect is a crack in the center of the forging.  
The vendor supplied 20 of these tees to the Public Service Electric & Gas
licensee and 3 of them to the South Carolina Electric & Gas licensee. The
vendor is continuing its analysis.                                       
_
HEADQUARTERS      MORNING REPORT     PAGE  3          FEBRUARY 16, 1999

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-99-0016
Engine Systems                         Date: 02/16/99
                                                                          

Subject: Part 21 - Incorrect resistor in Synchrostart speed switch in    
         EMD diesel generator control circuitry                          


Discussion:

VENDOR: Engine Systems                 PT21 FILE NO: 99-11-0             
                                                                         
DATE OF DOCUMENT: 01/26/99             ACCESSION NUMBER:                 
                                                                         
SOURCE DOCUMENT:                       REVIEWER: PECB, N. Fields         
                                                                         
                                                                         
NEW ISSUE.  The vendor, Engine Systems, reports degradation of three     
Synchrostart Model ESSB-4AT speed switches at the Hope Creek nuclear     
power plant.  These switches are standard components in the vendor's     
safety-related EMD diesel generator control systems.  Failure of the     
speed switch could disable generator field flashing, resulting in failure
of the diesel generator to build output voltage.  All three degradations 
occurred because an incorrect resistor was installed on the power supply 
card, resulting in heat-related damage to the other components on the    
power supply card.  The vendor is notifying all its nuclear customers.   
_
REGION II  MORNING REPORT     PAGE  4          FEBRUARY 16, 1999

Licensee/Facility:                     Notification:

Florida Power Corporation              MR Number: 2-99-0001
Crystal River 3                        Date: 02/16/99
Crystal River,Florida                  February 16, 1999                  
Dockets: 50-302
PWR/B&W-L-LP                          

Subject: UNANTICIPATED CONTRACT WORKER EXPOSURE FROM RADIOACTIVE PARTICLE

Discussion:

On February 12, 1999, the Crystal River Plant reported the discovery of a
radioactive particle in the lining of a worker's coat.  The coat was     
being worn by a contractor of the French firm Mecatiss.  The particle was
detected in the coat during initial processing and prior to entry into   
the licensee's radiologically controlled area (RCA).  The licensee       
recovered the radioactive particle which contained 0.0753 microcuries of 
Cobalt-60.  Based on assumptions regarding use of the coat, area of      
exposure and shielding provided by the coat lining and worker's shirt,   
the licensee estimated 1999 maximum doses to a 32 square centimeter area 
in the vicinity of the worker's shoulder to be approximately five        
millirem deep dose equivalent and eight millirem shallow dose equivalent.
No other radioactive particles were found on the individual, other       
Mecatiss workers or in the protected areas visited by the workers.  The  
precise source of the radioactive particle has not been determined at    
this time.                                                               

Regional Action:

Region II notified the State of Florida, NRC Office of International     
Programs, Office of Nuclear Material Safeguards, and the Office of the   
Executive Director for Operations regarding this incident.  The licensee 
has notified the State of Florida, Department of Health and is preparing 
to notify the corporate office of the employee.                          
                                                                         
The NRC RII office was initially notified of this incident by the        
licensee on February 12, 1999.                                           

Contact:  George Kuzo                (404)562-4658
_
REGION III  MORNING REPORT     PAGE  5          FEBRUARY 16, 1999

Licensee/Facility:                     Notification:

Indiana                                MR Number: 3-99-0008
Michigan Electric Co.                  Date: 02/16/99
Cook 1 2                               SRI VIA Telecon                    
Bridgman,Michigan                    
Dockets: 50-315,50-316
PWR/W-4-LP,PWR/W-4-LP                 

Subject: JOHN SAMPSON NAMED AMERICAN ELECTRIC POWER IN/MI STATE PRESIDENT

Discussion:

On February 16, 1999, Mr. John Sampson, D.C. Cook Site Vice President,   
was named as American Electric Power Indiana/Michigan State President,   
effective March 1, 1999. He succeeds Mr. Dick Boyle, who has been named  
Vice President - Regulatory Services. No replacement for Mr. Sampson has 
been named.                                                              

Regional Action:

Information Only                                                         

Contact:  A. Vegel                   (630)829-9620
_
REGION III  MORNING REPORT     PAGE  6          FEBRUARY 16, 1999

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-99-0009
Byron 1 2                              Date: 02/16/99
Byron,Illinois                         Licensee and SRI/RI via Telecon    
Dockets: 50-454,50-455
PWR/W-4-LP,PWR/W-4-LP                 

Subject: BYRON STATION SENIOR MANAGEMENT CHANGES                         

Discussion:

On 2/16/99, Mr. Ken Graesser, Byron Site Vice President, announced plans 
for retirement. Mr. William Levis, currently Station Manager will be     
prompted to Site Vice President. Mr. Richard Lopriore will join the      
company on 3/15/99 as the Station Manager.                               
                                                                         
Mr. Graesser will continue with ComEd until July, 1999, where he will    
lead development of a long range material condition plan for the Nuclear 
Generation Group.                                                        
                                                                         
Mr. Lopriore is coming to Byron station from Ontario Hydro where he was  
Assistant Vice President for Pickering Station Units 5 through 8. He also
held previous positions with Carolina Power and Light's Brunswick Nuclear
Power Plant and Vermont Yankee Nuclear Plant.                            

Regional Action:

This is for information.                                                 

Contact:  Michael Jordan             (630)829-9637