skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for January 15, 1999

 WPC‹
X2BPZ¦Courier 10cpiJ#xurier 10cpi BoldCourier 12cpiX@þþþþþþþþþHP LaserJet IIDHP2D.PRSÛxŒ
@ɇÏ,t0žSX@B#xX2!B!œX½9cCourier 10cpiCourier 10cpi BoldHPLASIID.PRSÛxŒ
@ɇÏ,t0zpX@Courier 10cpiCourier 10cpi Boldø–2xxx,RïôxŒ
@É“8Á;X@þþþþþþþþ6–2xxx,sðôxŒ
`ÉwÁ;X€þþþþþ²}*ddd,!Ò<ÂdŒ
@Ƀ8Á;ô@þþþþþþþþ.}*ddd,/s3ÂdŒ
`ÉwÁ;ô€þþþþþþþþX2BG`‰Courier 10cpiCourier 10cpi BoldCourier 12cpiCourier 12cpi BoldÔ}*ÔÐÐÐ°°tÐÑ#ÂdŒ
@Ƀ8Á;Ò><ô@#ÑÐÐÔÚÔHeadquarters Daily report
Ô*¼ÔÐÐÔÔ
ÐÐÔ"œÔJANUARY 15, 1999
Ô*¼ÔÐÐÔÔ
***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED
HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
***************************************************************************
Ô{0*0*0*°°ÔÔ}*ÔÃÃPRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  JANUARY 15, 1999ÄÄ

Ô}*NÔÃÃÃÃLicensee/Facility:ÄÄÄÄ                     ÃÃÃÃNotification:ÄÄÄÄ

Ô}*œÔCommonwealth Edison Co.                MR Number: ÃÃ3-99-0002ÄÄ
La Salle 1 2                           Date: 01/15/99
Marseilles,Illinois                    SRI via Telephone                  
Dockets: 50-373,50-374
BWR/GE-5,BWR/GE-5                     

Ô}*†ÔÃÃÃÃSubject:ÄÄÄÄ MANAGEMENT AND ORGANIZATIONAL CHANGES                           
                                                                         
Ô}*ÔÔÃÃÃÃReportable Event Number:ÄÄÄÄ N/A

Ô}*" ÔÃÃÃÃDiscussion:ÄÄÄÄ

On January 18, 1999, the LaSalle Unit 2 outage organization will         
transition back under site management. Work being completed during the   
extended Unit 2 refueling outage was being performed under the direction 
of the Commonwealth Edison (ComEd) Nuclear Generation Group (NGG) while  
the site organization focused on operating Unit 1. The licensee indicated
that the transition was to shift the focus of the station to the upcoming
testing and subsequent operation of Unit 2, which was planned for May    
1999. Unit 2 was shut down in September 1996 for a refueling outage and  
remained shut down to address problems with human performance, corrective
action program deficiencies, material condition deficiencies, and        
engineering and design issues.                                           
                                                                         
The licensee also announced that Jim Meister will become the Site        
Engineering Manager. Mr. Meister was the Unit 2 Restart Engineering      
Manager. Mr. Meister will replace Guy Campbell, who will be leaving ComEd
for a position at Lockheed Martin. In addition, Jeff Place will replace  
Neil Hightower as the Radiation Protection Manager. Mr. Place was        
formally the Radiation Protection Manager at Clinton Power Station.      

Ô}*ÕÔÃÃÃÃRegional Action:ÄÄÄÄ

For information.                                                         

Ô}*qÔÃÃÃÃContact:ÄÄÄÄ  R. Lanksbury               (630)829-9631