Morning Report for October 10, 2000

                       Headquarters Daily Report

                         OCTOBER 10, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                  X
REGION I                               X                   
REGION II                              X                   
REGION III                             X                  X
REGION IV           X                                      
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION IV  OCTOBER 10, 2000

Licensee/Facility:                     Notification:

Nebraska Public Power District         MR Number: 4-00-0017
Cooper 1                               Date: 10/10/00
Brownville,Nebraska                    RESIDENT INSPECTORS                
Dockets: 50-298
BWR/GE-4                              

Subject: FAILURE OF MAGNA-BLAST BREAKER FOLLOWING MODIFICATION           

Discussion:

On October 3, 2000, the Service Water Pump D breaker failed to close     
during a Technical Specification surveillance.  Operators removed the    
General Electric Type AMH circuit breaker from service and declared the  
pump to be inoperable.  Cooper Nuclear Station personnel noted that the  
prop spring bracket, part of the trip-free mechanism, had shifted        
position causing the breaker to trip free following closure.  The breaker
was replaced with a spare, and the failed braker was sent, accompanied by
licensee engineers, to a General Electric facility in Atlanta, Georgia   
for evaluation.                                                          
                                                                         
Since 1997, Cooper has modified the trip-free mechanicsm of 13           
safety-related Magna-Blast breakers, including the subject breaker, in   
accordance with General Electric specifications.  Subsequent to the      
modification, General Electric proliferated a revised (increased) torque 
specification for the prop spring bracket bolts.  On October 6, General  
Electric personnel determined that the failure of the breaker was        
directly attributable to the lower torque values used during             
modification.  The lower torques permitted rotation of the prop spring   
bracket, affecting the breaker's capability to reliably close and latch  
upon demand.  General Electric stated in a letter to the licensee that   
this was the first failure ever reported caused by the rotation of the   
prop spring bracket.  Licensee personnel have stated that General        
Electric considers this to be a potential Part 21 issue.  An estimated   
200-250 breakers nationwide were modified using the lower torque         
specification.                                                           
                                                                         
General Electric recommended checks and adjustments for each of the      
remaining breakers.  Over the holiday weekend, plant maintenance         
technicians inspected 2 of the remaining 12 breakers.  Neither prop      
spring bracket was found to have shifted.  Additionally, only one bolt   
was found to be under the new torque specification, and technicians      
stated that the bolt was tight, as found.  As a result of these findings,
licensee management decided that the remaining breakers could be         
inspected and retorqued via routine planned maintenance practices.       

Regional Action:

The Cooper resident inspectors will follow licensee actions to ensure    
that the corrective measures are appropriate, timely and comprehensive.  

Contact:  David Loveless             (817)860-8161
          Wayne Sifre                (817)860-8193