Morning Report for August 29, 2000

                       Headquarters Daily Report

                         AUGUST 29, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I            X                                      
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION I  AUGUST 29, 2000

Licensee/Facility:                     Notification:

Consolidated Edison Co. Of N.Y.        MR Number: 1-00-0012
Indian Point 2                         Date: 08/29/00
Buchanan,New York                                                         
Dockets: 50-247
PWR/W-4-LP                            

Subject: CON EDISON SENIOR MANAGEMENT CHANGE                             

Discussion:

J. Michael Evans, who served as President and Chief Operating Officer of 
Consolidated Edison since 1998 will retire.  Kevin Burke has been named  
as his replacement effective September 1, 2000.  Mr. Burke is currently  
the President of Orange and Rockland Utilities, Inc., also a subsidiary  
of Consolidated Edison, Inc., where he has served since July of 1999.    
Before joining Orange and Rockland, Mr. Burke was the senior vice        
president responsible for Con Edison's electric transmission and         
distribution systems as well as customer service.  He has been with      
Con Ed for 27 years, and has served as Vice President of Corporate       
Planning, Vice President of Brooklyn Customer Service, and Vice President
of Construction.                                                         
                                                                         

Regional Action:

None.                                                                    

Contact:  Pete Eselgroth             (610)337-5234
_
REGION III  MORNING REPORT     PAGE  2          AUGUST 29, 2000

Licensee/Facility:                     Notification:

Northern States Power Co.              MR Number: 3-00-0034
Monticello 1                           Date: 08/27/00
Monticello,Minnesota                   Telephone and E-mail from Res Insp 
Dockets: 50-263
BWR/GE-3                              

Subject: PLANT SHUTDOWN FOR MAIN TRANSFORMER MAINTENANCE                 

Discussion:

The plant completed a normal shutdown on August 27, 2000, at 4:17 p.m.   
The purpose of the shutdown was to perform corrective maintenance on     
bolted electrical connections located between the discharge of the main  
transformer and the associated mechanical disconnects to the electrical  
distribution grid. The bolted connections had shown evidence of          
increasing temperatures over several months. The licensee is conducting  
an investigation to determine the root cause for the elevated component  
temperatures.                                                            

Regional Action:

The resident inspectors observed control room and related shutdown       
activities.  No problems were identified with the performance of         
operators or safety-related plant equipment.  The inspectors continue to 
monitor plant operations and maintenance activities.                     

Contact:  R. Lanksbury               (630)829-9631
_