Morning Report for June 14, 2000

                       Headquarters Daily Report

                         JUNE 14, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II                              X                   
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS JUNE 14, 2000

Licensee/Facility:                     Notification:

                                       MR Number: H-00-0035
University Of Missouri At Columbia     Date: 06/14/00
                                                                          

Subject: Removal of Control Rod With Improper Core Configuration         

Discussion:

On June 13, 2000, the University of Missouri at Columbia reactor         
management contacted their Project Manager to report an event. A control 
rod was removed from the reactor without meeting the procedural          
requirement to unload two (of eight) fuel elements from the reactor core.
On June 12, 2000, a normal maintenance day at the facility, the licensee 
planned to replace a control rod (one of four). The control rods are run 
in the reactor for two years with one control rod replaced every six     
months. As part of the procedure for removing the control rod, two fuel  
elements are removed from the reactor core to make the reactor           
subcritical under all conditions.                                        
                                                                         
The reactor was refueled on the morning of June 12, 2000, as part of the 
normal maintenance day procedure. At about 11:00 am the control rod was  
removed from the reactor. At about 12:15 the operations crew realized    
that the control rod had been removed without removing the two fuel      
elements. At that point, a fuel movement procedure was developed and     
approved, the reactor head was removed, and the two fuel elements were   
removed from the core (this was completed at 13:52). The requirement for 
minimum shut down margin of 0.02 delta K was met at all times (the       
reactor was subcritical by 0.08 delta K with the control rod removed from
the reactor).                                                            
                                                                         
A conference call was held between NRC and licensee management on        
June 14, 2000, to discuss root causes, corrective actions and the        
licensee's decision process for restarting the reactor.                  
                                                                         
The licensee is investigating root causes and has preliminarily          
determined that a poorly written procedure coupled with the failure of   
operators to completely review the procedure prior to the task           
contributed to the event. The licensee also believes that the infrequent 
nature of removing control rods from the reactor contributed to the      
event.                                                                   
                                                                         
The licensee has discussed the event with a sub-committee of their safety
committee and will hold additional discussions with the safety           
sub-committee to review corrective actions prior to reactor restart. The 
licensee plans to have a number of corrective actions in place before the
reactor is restarted, including: conducting a training session with the  
operators to address lessons learned from the event, operator            
responsibilities and management expectations of operations personnel, and
all operating procedures will be reviewed prior to reactor start-up. In  
addition, the licensee will have a longer-term corrective action to      
perform an in-depth review of procedures. It is anticipated that the     
reactor will be restarted late on June 14, 2000.                         
                                                                         
Two NRC inspectors and the Chief of the Events Assessment, Generic       
Communications and Non-Power Reactors Branch will be on site June 15,    

HEADQUARTERS      MORNING REPORT     PAGE  2          JUNE 14, 2000
MR Number: H-00-0035 (cont.)

2000.                                                                    
                                                                         
Contact:    Alexander Adams, NRR                                         
            301-415-1127                                                 
            Email: axa@nrc.gov                                           