Morning Report for May 1, 2000

                       Headquarters Daily Report

                         MAY 01, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  MAY  1, 2000

Licensee/Facility:                     Notification:

Northern States Power Co.              MR Number: 3-00-0022
Prairie Island 2                       Date: 05/01/00
Welch,Minnesota                                                           
Dockets: 50-306
PWR/W-2-LP                            

Subject: Unit 2 Refueling Outage                                         

Discussion:

Prairie Island Unit 2 began a refueling outage on April 28, 2000. Major  
activities for the outage include steam generator eddy current           
inspections, steam generator row 1 and 2 tube u-bend heat treatment, a   
full-core fuel offload to support fuel assembly top nozzle inspections,  
and a D5 emergency diesel generator overhaul.                            
                                                                         
During the power descension prior to the start of the outage, the reactor
tripped at 21.6% power. The cause of the trip was a trip of the main     
turbine, apparently caused by a high water level signal from one of the  
feedwater heaters. A similar trip also occurred during the most recent   
shutdown of Unit 2 for a refueling outage in November 1998.              

Regional Action:

The resident inspectors observed portions of the reactor coolant system  
cooldown and will review selected operations and maintenance activities  
during the outage. The final licensee evaluation of the reactor trip will
also be reviewed.                                                        

Contact:  Roger Lanksbury            (630)829-9631