                         APRIL 24, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III                             X                   
REGION IV           X                                      
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION IV  APRIL 24, 2000

Licensee/Facility:                     Notification:

Nebraska Public Power District         MR Number: 4-00-0013
Cooper 1                               Date: 04/24/00
Brownville,Nebraska                    RIs                                
Dockets: 50-298
BWR/GE-4                              

Subject: UPDATE TO 4/18/00 MORNING REPORT -- EQUIPMENT QUALIFICATION     
         DEFICIENCIES WITH OKONITE TAPED SPLICES                         


Discussion:

On April 22, licensee management issued a stop work order on the         
application of 3M tape on environmentally qualified splices until        
resolution of discrepancies associated with the 3M qualification test    
report.  The 3M tape splices were being used to replace existing Okonite 
splices.  Identified discrepancies in the qualification test report      
included the installation methodology and the adequacy of the electrical 
testing of the representative splice.                                    
                                                                         
As of April 24, the licensee was continuing efforts to identify the scope
of the use of taped splices.  Licensee personnel inspecting terminal     
boxes in the reactor building over the weekend identified an additional  
26 EQ splices with Okonite tape treatments.  Licensee management has     
stated that all identified Okonite tape on environmentally qualified     
splices will be replaced.                                                
                                                                         
The licensee has ended their refueling outage on April 21 stating that   
all refueling work was complete and declared a forced outage for the     
purpose of repair and resolution of the issues related to taped splices  
at the facility.                                                         

Regional Action:

NRC personnel are evaluating the licensee's actions to correct EQ taped  
splice deficiencies.                                                     

Contact:  David Loveless             (817)860-8161
          C. Marschall               (817)860-8185