skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for April 17, 2000

                       Headquarters Daily Report

                         APRIL 17, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  APRIL 17, 2000

Licensee/Facility:                     Notification:

Firstenergy Nuclear Operating Co.      MR Number: 3-00-0019
Perry 1                                Date: 04/17/00
Perry,Ohio                             Verbal Notification by plant opers.
Dockets: 50-440
BWR/GE-6                              

Subject: PERRY OPERATORS IDENTIFY AND SUPPRESS THIRD AND FOURTH MINOR    
         FUEL DEFECTS                                                    


Discussion:

On April 6, 2000, routine chemistry samples indicated a slight increase  
in off-gas system pre-treatment radiation levels. The results of the     
licensee's subsequent analyses and discussions with General Electric     
indicated that a small fuel defect was the most likely cause for the     
increase in the off-gas system radiation levels. The radioactive material
detected in the off-gas system was less than 1 percent of that allowed by
the Perry Technical Specifications. The licensee commenced testing to    
identify the location of the fuel defect on April 13, 2000. On April 16, 
2000, two minor defects were identified and the flux in the area of each 
of the defects was suppressed. Two other defects had previously been     
identified and suppressed during this operating cycle. The first was on  
January 16, 2000 as discussed in Morning Report Numbers 3-00-0001 and    
3-00-0002, and the second was on February 14, 2000, as discussed in      
Morning Report Number 3-00-0009.                                         

Contact:  TOM KOZAK                  (630)829-9866
_