Morning Report for March 13, 2000

                       Headquarters Daily Report

                         MARCH 13, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS MARCH 13, 2000

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-00-0011
Salem/Ge                               Date: 03/13/00
                                                                          

Subject: Part 21 - Inadequate contact closure in GE Magne-Blast circuit  
         breaker model CR2940U301 switch                                 


Discussion:

VENDOR: General Electric                PT21 FILE NO: mm-04-0            
                                                                         
DATE OF DOCUMENT: 01/08/00              ACCESSION NUMBER: ml003677597    
                                                                         
SOURCE DOCUMENT: LETTER                 REVIEWER: REXB, E. Benner        
                                                                         
The Salem licensee reported that two new General Electric (GE) Model     
CR2940U301 switches failed preinstallation testing.  This model switch   
consists of a single normally-closed contact that is plunger-actuated and
contained in a plastic housing.  It is used in the control circuit of GE 
Magne-Blast circuit breakers as the spring-charging motor limit switch.  
Failure of this switch will prevent the associated breaker from closing  
on a demand signal.  At Salem, this model switch is used on breakers in  
safety-related and nonsafety-related applications. The licensee stated   
that these failures appear to be caused by inadequate contact closure. GE
is performing a failure analysis, expected to be completed               
February 29, 2000, which the licensee will incorporate into the final    
reportability determination.                                             
                                                                         
The licensee previously evaluated three other failures of this model     
switch at Salem. This information will also be incorporated into the     
final reportability determination.                                       
                                                                         
Operational experience that may be related to this report is described in
NRC Information Notice 95-02, "Problems with General Electric CR2940     
Contact Blocks in Medium-Voltage Circuit Breakers," dated January 17,    
1995.                                                                    
                                                                         
The NRC will post ensuing reports on this subject on its website at      
http://www.nrc.gov/NRC/PUBLIC/PART21/2000.                               
                                                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  2          MARCH 13, 2000

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-00-0012
Clinton/Asco                           Date: 03/13/00
                                                                          

Subject: Part 21 - Test failures of new pump assemblies for              
         hydramotor actuators                                            


Discussion:

VENDOR: ASCO                        PT21 FILE NO: mm-05-0                
                                                                         
DATE OF DOCUMENT: 01/14/00          ACCESSION NUMBER: ml003677966        
                                                                         
SOURCE DOCUMENT: LETTER             REVIEWER: REXB, T. Greene            
                                                                         
The Clinton licensee reported two test failures of a hydramotor (an      
electrohydraulic push-type linear actuator). In the first case, the      
redundant relief valve did not meet the fail-safe spring-return time test
acceptance criterion provided in the maintenance procedure. In the second
case, the hydramotor recycle rate was not consistent with maintenance    
procedure criteria. In each case, the licensee had installed a new pump  
assembly from stores into the hydramotor. When the licensee put the old  
pump assemblies back, they tested satisfactorily. The new pump assemblies
are manufactured by ITT Barton, now Automatic Switch Company (ASCO). In  
the first case, the part number is NS109761AQ and in the second case, the
part number is NS109761EQX07. In both cases, the licensee returned the   
new pump assembly to ASCO for resolution.                                
                                                                         
The NRC will post ensuing reports on this subject on its website at      
http://www.nrc.gov/NRC/PUBLIC/PART21/2000.                               
                                                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  3          MARCH 13, 2000

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-00-0013
Solidstate Controls                    Date: 03/13/00
                                                                          

Subject: Part 21 - Potential defect in static switch control and         
         regulated rectifier control assemblies                          


Discussion:

VENDOR: Solidstate Controls                 PT21 FILE NO: mm-06-0        
                                                                         
DATE OF DOCUMENT: 01/26/00                  ACCESSION NUMBER: ml003678497
                                                                         
SOURCE DOCUMENT: EN 36627                   REVIEWER: REXB, V. Hodge     
                                                                         
                                                                         
Solidstate Controls, Inc., the vendor, supplied uninterruptible power    
supplies and battery chargers, manufactured under its 10 CFR 50 Appendix 
B program, to several nuclear power plants. The vendor reports a         
potential defect in static switch control assemblies and regulated       
rectifier control assemblies used in these components. The problem is    
associated with a component unijunction transistor, part number          
03-650007-00. In the uninterruptible power supplies, the static switch   
sporadically changes from normal to bypass or alternate settings. In the 
battery chargers, the regulated rectifier sporadically produces a higher 
direct current voltage than desired.                                     
                                                                         
The vendor notified the following affected nuclear power plants: Indian  
Point 2, Catawba, Oconee, Arkansas, Waterford, Crystal River, Diablo     
Canyon, Sequoyah, and Surry.                                             
                                                                         
In subsequent telephone calls with the vendor, the NRC learned that some 
of the affected customers have returned the spare parts to the vendor for
replacement with corrected assemblies.                                   
                                                                         
A listing of affected customers and part numbers is given at             
http://www.nrc.gov/NRC/PUBLIC/PART21/2000/mm060.html                     
                                                                         
The NRC will post ensuing reports on this subject on its website at      
http://www.nrc.gov/NRC/PUBLIC/PART21/2000.                               
                                                                         
Contact:    Kamal Naidu                                                  
            (301)415-2980                                                
            email: krn@nrc.gov                                           
                                                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  4          MARCH 13, 2000

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-00-0014
Nine Mile 2/Stone & Webster            Date: 03/13/00
                                                                          

Subject: Part 21 - Nonconservative environmental qualification           
         calculations                                                    


Discussion:

VENDOR: Stone and Webster               PT21 FILE NO: mm-07-0            
                                                                         
DATE OF DOCUMENT: 02/18/00              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 36708               REVIEWER: REXB, E. Goodwin       
                                                                         
The Nine Mile Unit 2 licensee reported nonconservative calculations for  
environmental qualification of numerous components in multiple systems.  
The supplier of the calculations, Stone and Webster Engineering          
Corporation, assumed lowest expected ambient temperatures instead of     
normal expected ambient temperatures for winter periods. The consequences
of correcting these assumptions is to reduce the qualified lifetimes for 
about 30 components from more than 40 years to less than 40 years. For   
several hundred components, the correction reduces qualified lifetimes   
but not to less than 40 years.                                           
                                                                         
The NRC will post ensuing reports on this subject on its website at      
http://www.nrc.gov/NRC/PUBLIC/PART21/2000.                               
                                                                         
_
REGION III  MORNING REPORT     PAGE  5          MARCH 13, 2000

Licensee/Facility:                     Notification:

Commonwealth Edison Co.                MR Number: 3-00-0015
Byron 1 2                              Date: 03/10/00
Byron,Illinois                                                            
Dockets: 50-454,50-455
PWR/W-4-LP,PWR/W-4-LP                 

Subject: Byron Station Management Changes                                

Discussion:

On March 10, 2000, Byron Station Site Vice President, Bill Levis,        
announced the following management changes at Byron Station.             
                                                                         
þ Steve Kuczynski will replace Mike Jurmain as the Byron Station         
Maintenance Manager, who will be leaving Commonwealth Edison Company.    
Steve Kuczynski was previously the Byron Station Nuclear Oversight       
Manager.                                                                 
                                                                         
þ Bob Deppi will be assuming the responsibilities of the Byron Station   
Nuclear Oversight Manager. Bob Deppi was previously the Nuclear          
Generation Group Operations Manager.                                     
                                                                         
þ Marseyne Snow will be assuming the responsibilities of the Nuclear     
Generation Group Operations Manager. Marseyne Snow was previously the    
Byron Station Operations Manager.                                        
                                                                         
þ Dave Hoots will be assuming the responsibilities of the Byron Station  
Operations Manager. Dave Hoots was previously the Braidwood Station Shift
Operations Supervisor.                                                   
                                                                         
All personnel changes are expected to be completed by April 10, 2000.    

Contact:  Michael Jordan             (630)829-9637