Morning Report for January 11, 2000

                       Headquarters Daily Report

                         JANUARY 11, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III                             X                   
REGION IV           X                                      
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION IV  JANUARY 11, 2000

Licensee/Facility:                     Notification:

Entergy Operations, Inc.               MR Number: 4-00-0003
Arkansas Nuclear 1                     Date: 01/11/00
Russelville,Arkansas                   SRI VIA TELEPHONE                  
Dockets: 50-313
PWR/B&W-L-LP                          

Subject: SHUTDOWN OF ARKANSAS NUCLEAR ONE (ANO), UNIT 1, FOR WORK ON     
         REACTOR COOLANT PUMP (RCP) D                                    


Discussion:

On January 7, 2000, ANO, Unit 1, was shutdown to repair a small          
lubricating oil leak on RCP D.  On January 8, RCP D was secured for work 
on the lube oil system. When the pump was secured, the Senior Resident   
Inspector observed the pump shaft rotate in the reverse direction for    
about 3 seconds until a relatively loud noise was heard, and then the    
pump shaft stopped.  The noise coincided with the engagement of the      
anti-rotation device. Subsequently, broken parts of the anti-rotation    
device were found by the licensee.                                       
                                                                         
                                                                         
ANO Unit 1 remains shutdown pending installation of a temporary          
alteration on the RCP.  This alteration will be designed to prevent pump 
rotation in either direction.  Installation of the alteration will allow 
the licensee to restart the unit operating only 3 of the 4 RCPs. The unit
is licensed and has performed the appropriate accident analyses for      
operation in this configuration. In addition, training of the on-shift   
crews has begun for this abnormal plant configuration.                   
                                                                         

Regional Action:

Routine resident inspector followup inspection.                          

Contact:  Phillip Harrell            (817)860-8250
          Russell Bywater            (501)968-3290