Morning Report for January 10, 2000

                       Headquarters Daily Report

                         JANUARY 10, 2000

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II           X                                      
REGION III                             X                   
REGION IV           X                                      
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  JANUARY 10, 2000

Licensee/Facility:                     Notification:

Carolina Power & Light Co.             MR Number: 2-00-0001
Harris 1                               Date: 01/10/00
Raleigh,North Carolina                                                    
Dockets: 50-400
PWR/W-3-LP                            

Subject: MANAGEMENT CHANGES                                              

Discussion:

Carolina Power & Light (CP&L) announced on January 6, 2000, that         
Bob Duncan will become the new plant general manager at Shearon Harris   
effective January 31, 2000.  This position had previously been occupied  
by Bo Clark, who has accepted a new assignment participating as an INPO  
loanee.  Mr. Duncan is currently the Engineering Manager at the Robinson 
Station.                                                                 

Regional Action:

None.                                                                    

Contact:  George T. MacDonald        (404)562-4543
_
REGION IV  MORNING REPORT     PAGE  2          JANUARY 10, 2000

Licensee/Facility:                     Notification:

Nebraska Public Power District         MR Number: 4-00-0002
Cooper 1                               Date: 01/10/00
Brownville,Nebraska                    RESIDENT INSPECTORS                
Dockets: 50-298
BWR/GE-4                              

Subject: SHUTDOWN TO REPAIR REACTOR EQUIPMENT COOLING SYSTEM LEAK        

Discussion:

At about 11:00 a.m. on January 7, Cooper operators began a controlled    
power reduction to 12 percent power in response to increasing leakage    
from the reactor equipment cooling system.  On January 8 at 1:30 a.m.,   
operators entered containment but could not locate the leak.  The        
operators continued the planned shutdown by manually scramming the       
reactor just before noon on January 8, 2000. After the shutdown, workers 
found the leak in the 'C' containment fan cooler, one of four containment
fan coolers, and isolated its supply of reactor equipment cooling,       
leaving three coolers in service. The containment fan coolers do not     
perform any safety-related function, and licensee analysis of operating  
requirements for containment cooling supports operation with as few as   
two of the four coolers.  Plant management planned to restart the unit   
upon completion of repairs.                                              

Regional Action:

Throughout the weekend the resident inspectors observed portions of the  
shutdown, the containment entries, and monitored licensee efforts to     
identify and repair the leak.  They will continue to monitor outage      
activities and preparation for startup.                                  

Contact:  Charles S. Marschall       (817)860-8185