PRIORITY ATTENTION REQUIRED MORNING REPORT - HEADQUARTERS NOV. 21, 2002
Licensee/Facility: Notification:
Part 21 Database MR Number: H-02-0097
Facility: C&D TECHNOLOGIES (CORRECTION) Date: 11/21/02
Subject: Correction - Part 21 - Incorrect welds found in recently
fabricated battery racks
Discussion:
VENDOR: C&D Technologies PT21 FILE NO: m2-29-0
DATE OF DOCUMENT: 10/11/02 ACCESSION NUMBER: ml022900283
SOURCE DOCUMENT: LETTER REVIEWER: RORP, J. Dozier
On November 18, 2002, Morning Report H-02-0094 was issued concerning
incorrect welds found in recently fabricated battery racks. The MR
incorrectly stated "fuel" racks and it should have read "battery" racks.
Below is the correction:
C&D Technologies, a vendor of battery racks, reported that a series of
welds joining the horizontal cross beam to the vertical member of the
frame were not welded correctly during fabrication of two single tier
battery racks for the Prairie Island nuclear facility. The incorrect
welds may affect the seismic qualification of the rack. These defects
were identified before installation, thus the racks were not installed at
Prairie Island. The vendor is undertaking corrective action to ensure
that future racks will not have this defect.
Contact: J. Dozier, NRR
301-415-1014