Morning Report for September 12, 2002



                       Headquarters Daily Report

                         SEPTEMBER 12, 2002

***********************************************************
                    REPORT             NEGATIVE            
                    ATTACHED           INPUT RECEIVED      

HEADQUARTERS        X                                      
REGION I                               X                   
REGION II                              X                   
REGION III                             X                   
REGION IV                              X




                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS SEP. 12, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0071
Abb                                    Date: 09/12/02
                                                                          

Subject: Part 21 - Test failure of a power shield trip device            
         manufactured before March 1991                                  


Discussion:

VENDOR: ABB                         PT21 FILE NO: m2-22-0                
                                                                         
DATE OF DOCUMENT: 08/26/02          ACCESSION NUMBER: ml022410017        
                                                                         
SOURCE DOCUMENT: LETTER             REVIEWER: RORP, C. Petrone           
                                                                         
ABB, a vendor of electrical equipment, reported being notified by the    
Summer licensee of a failure of a power shield trip device during        
surveillance testing. Two of the three phases tripped at more than 20    
percent above the nominal set point. The failed device, a 225 Amp model, 
serial number 32301, was being used in a non-safety related application. 
                                                                         
The licensee indicated that during single phase testing with maximum amp 
tap and instantaneous tap settings (225 amp and 12X, respectively), the  
transformer board current transformer would saturate, causing the trip   
point to be out of specification. Lower settings resulted in trip points 
within tolerance.                                                        
                                                                         
In March 1991, the vendor discontinued manufacture of the current        
transformer design used in the failed device. Power shield trip devices  
that were dedicated as 1E nuclear safety related devices and manufactured
before March 1991 have the transformer that may saturate at the highest  
instantaneous tap setting. Products with a serial number of 82019 and    
below also may have the transformer affected by this notice. The vendor  
recommends that customers use lower than maximum instantaneous tap       
settings or replace the transformer board with one that has the improved 
transformer design.                                                      
                                                                         
Contact:    C. Petrone, NRR                                              
            301-415-1027                                                 
            E-mail: cdp@nrc.gov                                          
_
HEADQUARTERS      MORNING REPORT     PAGE  2          SEPTEMBER 12, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0072
Rosemount                              Date: 09/12/02
                                                                          

Subject: Part 21 - Test failures of capacitors in damping circuits of    
         certain Models 1153 and 1154 pressure transmitters              


Discussion:

VENDOR: Rosemount                       PT21 FILE NO: m2-23-0            
                                                                         
DATE OF DOCUMENT:  08/30/02             ACCESSION NUMBER: ml022470359    
                                                                         
SOURCE DOCUMENT: LETTER                 REVIEWER: RORP, R. Caldwell      
                                                                         
The vendor, Rosemount Nuclear Instrumentation, reported that capacitors  
supplied to it from December 2000 until July 2002 were inadequately      
tested for conformance to the vendor's specification for high temperature
insulation resistance. Vendor testing demonstrated significant insulation
breakdown which may cause transmitter failure at temperatures greater    
than the normal operating temperatures. Instruments of concern are Model 
1153 and 1154 pressure transmitters with optional adjustable circuits to 
damp voltage swings from pressure oscillations. Affected domestic nuclear
power plant licensees include Amergen Energy, Carolina Power and Light,  
Constellation Nuclear, Dominion Generation, Entergy, Exelon Generation,  
FirstEnergy, PECO Energy, and Public Service Electric and Gas.           
                                                                         
Contact:    R. Caldwell, NRR                                             
            301-415-1243                                                 
            E-mail: rkc1@nrc.gov                                         
                                                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  3          SEPTEMBER 12, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0073
Rosemount                              Date: 09/12/02
                                                                          

Subject: Part 21-Certain Model 1153 differential pressure transmitters & 
         spare sensor modules may not meet the published temp effect spec


Discussion:

VENDOR: Rosemount                       PT21 FILE NO: m2-24-0            
                                                                         
DATE OF DOCUMENT: 09/09/02              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 39178               REVIEWER: RORP, J. Foster        
                                                                         
The vendor, Rosemount Nuclear Instrumentation, reported that certain     
Model 1153 differential pressure transmitters and spare sensor modules   
may not meet the published temperature effect specification. This        
specification establishes an expected analog output error interval during
normal ambient temperature variations occurring between 40 F and 200 F.  
The root cause of the potential nonconformance has been narrowed to the  
effect of temperature changes on the transmitter module. Instruments of  
concern are certain Model 1153 differential pressure transmitters with   
model codes beginning with 1153D or 1153H shipped between March 2001 and 
August 2002 and spare sensor modules shipped between March 2001 and      
August 2002 with kit part numbers:                                       
                                                                         
01153-0320-0232                                                          
01153-0320-0352                                                          
01153-0320-0252                                                          
                                                                         
Affected domestic nuclear power plant licensees include Carolina Power   
and Light, Constellation Nuclear, Detroit Edison, Dominion Generation,   
Duke Energy, Entergy, Exelon Generation, FirstEnergy, Florida Power and  
Light, Georgia Power, North Atlantic Energy Service, Pacific Gas and     
Electric, Public Service Electric and Gas, Southern California Edison,   
and TXU Electric and Gas.                                                
                                                                         
Contact:    J. Foster, NRR                                               
            301-415-3647                                                 
            E-mail: jwf@nrc.gov                                          
_
HEADQUARTERS      MORNING REPORT     PAGE  4          SEPTEMBER 12, 2002

MR Number: H-02-0074

                           NRR DAILY REPORT ITEM
                           GENERIC COMMUNICATIONS


Subject: Issuance of Information Notice 2002-26

Information Notice 2002-26: Failure of Steam Dryer Cover Plate After     
a Recent Power Uprate dated September 11, 2002                           
                                                                         
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information 
notice to alert addressees to a recent failure of a steam dryer cover    
plate during operations following a power uprate at a boiling water      
reactor (BWR).                                                           
                                                                         
ADAMS Accession No.:  ML022530291                                        
                                                                         
Contacts:   Karla Stoedter, Region III      Robert Caldwell, NRR         
            (309) 654-2227                  (301) 415-1243               
            E-mail: kkb@nrc.gov             E-mail: rkc1@nrc.gov         
                                                                         
            Carl Lyon, NRR                                               
            (301) 415-2296                                               
            E-mail: cfl@nrc.gov                                          
_