Morning Report for September 10, 2002




                       Headquarters Daily Report

                         SEPTEMBER 10, 2002

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS           X                                     
REGION I                                  X                 
REGION II                                 X                 
REGION III                                X                 
REGION IV                                 X


                 
PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS SEP. 10, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0064
Engine Systems                         Date: 09/10/02
                                                                          

Subject: Part 21 - EMD emergency diesel generator air start system       
         pressure regulating valve may stick open                        


Discussion:

VENDOR: Engine Systems                  PT21 FILE NO: m2-18-0            
                                                                         
DATE OF DOCUMENT: 07/30/02              ACCESSION NUMBER: ml022190534    
                                                                         
SOURCE DOCUMENT: LETTER                 REVIEWER: RORP, R. Caldwell      
                                                                         
Engine Systems, a vendor of EMD emergency diesel generators, concluded   
its investigation of a condition with EMD air start systems using Norgren
R18 relieving style air pressure regulating valves. During an engine     
start, the sudden high air flow followed by its immediate termination,   
causes the internal components of the pressure regulating valve to be    
excessively deflected. As a result, the valve sticks open until the air  
receiver pressure drops, via its relieving tube, to a value low enough to
allow the valve to close. The vendor learned of this problem from the    
Sequoyah and Davis-Besse nuclear power plants.                           
                                                                         
Contact:    R. Caldwell, NRR                                             
            301-415-1243                                                 
            E-mail: rkc1@nrc.gov                                         
_
HEADQUARTERS      MORNING REPORT     PAGE  2          SEPTEMBER 10, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0065
Engine Systems                         Date: 09/10/02
                                                                          

Subject: Part 21 - Potential bearing cooling oil blockage from loose     
         flashing material used in manufacture of EMD 645 engine pistons 


Discussion:

VENDOR: Engine Systems                  PT21 FILE NO: m2-19-0            
                                                                         
DATE OF DOCUMENT: 08/01/02              ACCESSION NUMBER: ml022200286    
                                                                         
SOURCE DOCUMENT: LETTER                 REVIEWER: RORP, J. Dozier        
                                                                         
Engine Systems, a vendor of EMD emergency diesel generators, concluded   
its investigation of a condition with EMD 645 engine pistons. Loose      
casting flash material applied during the manufacturing process could    
block the insert bearing oil passage and cause bearing damage. However,  
the manufacturer, EMD, has reported no actual failures because of this   
condition in nuclear or commercial applications.                         
                                                                         
Contact:    J. Dozier, NRR                                               
            301-415-1014                                                 
            E-mail: jxd@nrc.gov                                          
_
HEADQUARTERS      MORNING REPORT     PAGE  3          SEPTEMBER 10, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0066
Rockbestos                             Date: 09/10/02
                                                                          

Subject: Part 21 - Incorrect lacquer applied to electrical cable could   
         contribute to flame propagation                                 


Discussion:

VENDOR: Rockbestos                      PT21 FILE NO: m2-20-0            
                                                                         
DATE OF DOCUMENT: 08/09/02              ACCESSION NUMBER: ml022260608    
                                                                         
SOURCE DOCUMENT: LETTER                 REVIEWER: RORP, V. Hodge         
                                                                         
Rockbestos-Surprenant, a vendor of electrical cables, reported that its  
2/C 14 AWG 600V Firewall SR (Silicone Rubber) cable with overall Rockhide
braid failed the vertical tray flame test when subjected to the          
requirements described in the standard IEEE-383-1974, Section 2.5.4. The 
lacquer applied to the braid was incorrect and could contribute to the   
propagation of flame. The vendor states that its initial investigation   
indicates that the affected cables are limited to 8 part numbers or      
shipments of this cable manufactured from 1999 through July 2002. The    
vendor stated that it notified affected purchasers.                      
                                                                         
Contact:    V. Hodge, NRR                                                
            301-415-1861                                                 
            E-mail: cvh@nrc.gov                                          
_
HEADQUARTERS      MORNING REPORT     PAGE  4          SEPTEMBER 10, 2002

Licensee/Facility:                     Notification:

Part 21 Database                       MR Number: H-02-0067
General Electric                       Date: 09/10/02
                                                                          

Subject: Part 21-Inadequate vibratory loads on main steam isolation      
         valves with one main steam isolation valve out of service       


Discussion:

VENDOR: General Electric                PT21 FILE NO: m2-21-0            
                                                                         
DATE OF DOCUMENT: 08/23/02              ACCESSION NUMBER:                
                                                                         
SOURCE DOCUMENT: EN 39148               REVIEWER: RORP, I. Jung          
                                                                         
General Electric, boiling water reactor nuclear steam supply system      
vendor, reported that its 1988 analysis for Brunswick Units 1 and 2 full 
power operation with one main steam isolation valve (MSIV) out of service
did not adequately address the increased flow-induced vibratory loads on 
the MSIVs in service. That evaluation used 100 percent flow in the three 
active steamlines when it should be 133 percent flow. Absent test data,  
the vendor recommends that power be limited to 75 percent while one MSIV 
is out of service. The vendor notified the Brunswick licensee and will   
notify other affected licensees.                                         
                                                                         
Contact:    I. Jung, NRR                                                 
            301-415-1837                                                 
            E-mail: ixj@nrc.gov                                          