skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for June 10, 2002

                       Headquarters Daily report

                         JUNE 10, 2002

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED
HEADQUARTERS                           X                   
REGION I                               X                   
REGION II                              X                   
REGION III          X                                      
REGION IV                              X                   
***************************************************************************



PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION III  JUNE 10, 1902

Licensee/Facility:                     Notification:

Nuclear Management Company             MR Number: 3-02-0018
Prairie Island 1 2                     Date: 06/03/02
Welch,Minnesota                        E-mail from the resident inspectors
Dockets: 50-282,50-306
PWR/W-2-LP,PWR/W-2-LP                 

Subject: Prairie Island Organization Change                              
                                                                         
Reportable Event Number: N/A

Discussion:

Mark Reddemann, NMC Vice President of Engineering, announced the         
appointment of Scott Northard as Prairie Island Engineering Director,    
effective July 1, 2002. Northard, who is currently Director of Nuclear   
Asset Management for Xcel Energy, the utility owner of Prairie Island,   
will replace Joe Jensen, who had been temporarily assigned to the        
engineering director position.                                           
                                                                         
Northard has been the Director of Nuclear Asset Management for Xcel      
Energy since NMC was formed. He originally started at Prairie Island in  
1977 as a system engineer and later as a nuclear engineer. He has also   
served as Manager, Special Nuclear Programs, Director of Personnel for   
Electric Utility, Director of Materials Management and Manager of        
Technical Standards for Xcel Energy (formerly NSP).                      

Regional Action:


Contact:  Roger Lanksbury, RDL       (630)829-9631