skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Morning Report for April 22, 2002

                       Headquarters Daily Report

                         APRIL 22, 2002

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II           X                                      
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  APRIL 22, 2002

Licensee/Facility:                     Notification:

Duke Power Co.                         MR Number: 2-02-0007
Oconee 1                               Date: 04/22/02
Seneca,South Carolina                                                     
Dockets: 50-269
PWR/B&W-L-LP                          

Subject: SEVERED PLUGGED TUBE DISCOVERED IN STEAM GENERATOR              

Discussion:

On April 15, 2002, the licensee informed the NRC that they had discovered
a severed plugged tube in the 1B steam generator during outage           
inspections.  Tube 78-124 was severed at the lower tube sheet.  The      
licensee found the severed tube when an adjacent tube's plug was pulled  
for repair and wear scars were detected on it by eddy current            
examination.  The licensee removed a section of the severed tube for     
metallurgical examination and root cause analysis.                       

Regional Action:

Under the guidance of NRC Management Directive 8.3, Region II initiated a
Special Inspection on April 17, 2002.  The location of the severed tube  
indicated that the failure mechanism was different than a recent severed 
tube at Three Mile Island 1, as described in NRC Information Notice      
2002-02, Recent Experience With Plugged Steam Generator Tubes.  The      
specific issue of concern to be addressed by the inspection is to obtain 
information so that the generic implications of the tube failure can be  
assessed.                                                                

Contact:  JEROME BLAKE               (404)562-4607
_