Morning Report for April 9, 2002

                       Headquarters Daily Report

                         APRIL 09, 2002

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS                           X                   
REGION I                               X                   
REGION II             X                   
REGION III                             X                   
REGION IV                              X                   


 PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION II  APRIL  9, 2002

Licensee/Facility:                     Notification:

Carolina Power & Light Co.             MR Number: 2-02-0005
Harris 1                               Date: 04/09/02
Raleigh,North Carolina                                                    
Dockets: 50-400
PWR/W-3-LP                            

Subject: GAS ACCUMULATION IN THE CHARGING/SAFETY INJECTION PUMP          
         COMMON SUCTION HEADER - HARRIS NUCLEAR STATION                  

Reportable Event Number: N/A

Discussion:

On April 3, 2002, while conducting a preventive maintenance procedure to 
check for gas accumulation in the emergency core cooling system piping   
from the licensee identified that a section of the common suction header 
from the refueling water storage tank (RWST) to the charging/safety      
injection pumps (CSIPs) was filled with gas.  The licensee estimated     
there was about 3.5 cubic feet of gas in the pipe.  This piping is a high
point above the CSIP rooms and has no vent valve.  The licensee vented   
the gas by loosening the cap to a check valve located in this piping.    
The licensee declared both CSIPs inoperable when the gas was identified. 
The pumps were declared operable when the venting was complete.  The     
licensee continued to monitor for further gas accumulation in this       
section of the piping. None was identified.  The unit is at full power.  

Regional Action:

Under the guidance of NRC Management Directive 8.3, Region II initiated a
Special Inspection at the site on April 9, 2002.  The specific issue of  
concern to be addressed by the Special Inspection Team is whether the    
CSIPs were operable and would they have performed their safety function  
with gas in the common suction line from the RWST.                       