Morning Report for March 21, 2002

                       Headquarters Daily Report

                         MARCH 21, 2002

***************************************************************************
                    REPORT             NEGATIVE            NO INPUT
                    ATTACHED           INPUT RECEIVED      RECEIVED

HEADQUARTERS        X                                      
REGION I            X                                      
REGION II                              X                                      
REGION III                             X                   
REGION IV                              X                   
PRIORITY ATTENTION REQUIRED  MORNING REPORT - REGION I  MARCH 21, 2002

Licensee/Facility:                     Notification:

Vermont Yankee Nuclear Power Corp.     MR Number: 1-02-0001
Vermont Yankee 1                       Date: 03/20/02
Vernon,Vermont                                                            
Dockets: 50-271
BWR/GE-4                              


Subject: VERMONT YANKEE FUEL LEAKS                                       

Discussion:

On March 18, and again on March 20, 2002, Vermont Yankee identified fuel 
cladding failures, the fourth and fifth such occurences since early      
December 2001.  These fuel clad failures were identified by an increase  
in the detected activity in the offgas flow pretreatment system.  The    
previous failures occurred following control rod pattern adjustments. The
fourth failure occurred following weekly control rod exercising and a    
subsequent power increase from 90 to 100 percent using reactor           
recirculation flow.  The fifth leak occurred from a steady-state         
condition of 100 percent power.                                          
                                                                         
On the prior three events, the licensee confirmed fuel leaks through     
power suppression testing.  The first two fuel leaks were identified on  
December 2 and 12 and were determined to be pinhole leaks of suspected   
twice-burned fuel assemblies located near the core center. On March 5, a 
third fuel leak occurred, which was believed to be slightly larger than  
the earlier pinhole leaks.  Again the licensee suspected a twice-burned  
fuel assembly, which was located in the middle-third of the core.  The   
three earlier suspected fuel leaks were suppressed by inserting adjacent 
control rods (at core locations 23-18, 22-19, and 22-35, respectively).  
                                                                         
The licensee is considering additional power suppression testing to      
identify the location of the fourth and fifth fuel leaks and they are    
evaluating a mid-cylce outage.  Isotopic results indicate that the recent
fuel leaks are also from twice-burned assemblies.  The reactor coolant   
dose equivalent Iodine-131 and offgas flow pretreatment activity levels  
remain well below the technical specification limits.  The Vermont Yankee
core contains only GE-13 type fuel.  The licensee is working with the    
fuel vendor (GE) to identify the cause of these fuel leaks.              
                                                                         

Regional Action:

Resident follow-up.                                                      

Contact:  Clifford Anderson          (610)337-5227
          Robert Summers             (610)337-5282
          Brian McDermott            (802)257-4319

PRIORITY ATTENTION REQUIRED  MORNING REPORT - HEADQUARTERS MARCH 20,
2002

Licensee/Facility:                     Notification:

Abb, Inc                               MR Number: H-02-0023
Abb, Inc.                              Date: 03/19/02
Coral Spring,Florida                                                      

Subject: Initial Notification of Potential Defect in Class 1E Type CV-2  
         and CV-22 Relays (Update)                                       

Reportable Event Number: 38781                         

Discussion:

On March 19, 2002, ABB Inc. reported a potentially missing balance weight
assembly on the moving disc in the subject relays. Discussion with the   
vendor indicated that these relays are undervoltage electromechanical    
relays. The effect of the missing balance weight assembly is to increase 
the operating time beyond that specified. The defect may be detected     
either by calibration test or by visual inspection. In visual inspection,
the black balance weight assembly, if present, is located on top of the  
shiny moving disc. One affected customer has reported this defect to the 
vendor.                                                                  
                                                                         
Contacts:   C. Vernon Hodge         Joelle Starefos                      
            (301) 415-1861          (301) 415-1175                       
            E-mail: cvh@nrc.gov     E-mail: jls1@nrc.gov                 